The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

TEXAS DEPARTMENT OF TRANSPORTATION

...
UEIKXKDXF9XV5T3·Profile updated 2026-05-13
Awards tracked
8
Total amount
$623.7M
Date range
2026-02-18 → 2026-04-17
Primary sector
Volume
$/month, last 24
About this recipient

TEXAS DEPARTMENT OF TRANSPORTATION has received $623.7M in tracked federal funding across the ingest window.

The largest single source of funding is Department of Transportation, which dominates the recipient's federal portfolio. We surface the full breakdown of contracts and grants below.

A longer, LLM-generated profile becomes available for the top entities by total $ awarded. We do not take editorial direction from recipients.

Portfolio by sector
Sectors classified by LLM on each award.
Portfolio status
Based on each award's period of performance.
Active
8
active100% of awards
Expiring (≤90d)
0
expiring · 30d0% of awards
Expired
0
expired0% of awards
No POP
0
0% of awards
Top awarding agencies
Department of Transportation
$623.7M 100%

Based on 8 awards totaling $623,663,131.

Awards

Top 8 by amount

Action dateRecipientAgencyAmountDescriptionSectorStatus
2026-02-18TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$144,376,313PROJECT TITLE: FY 2026 STATE PLANNING AND RESEARCH WORK PROGRAM :::: PROJECT DESCRIPTION: FY 2026 STATE PLANNING AND RESEARCH WORK PROGRAMactive
2026-04-02TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$115,307,833PROJECT TITLE: WIDEN ROAD-ADD LANES ON IH 45. :::: PROJECT DESCRIPTION: IH 45 FROM 0.3 MILES NORTH OF SH 19 TO SH 30; FROM SH 30 TO 0.9 MILES NORTH OF SH 30. WIDEN ROAD - ADD LANES.active
2026-04-17TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$111,255,190PROJECT TITLE: HIGHWAY IMPROVEMENT ON IH 410. :::: PROJECT DESCRIPTION: IH 410 AT US 281 AND SAN PEDRO; OPERATIONAL IMPROVEMENTS TO INCLUDE DIRECT CONNECTOR IMPROVEMENT FROM US 281 TO IH 410 WEST BOUND; RAMP REVISIONS, FRONTAGE ROAD AND INTERSECTION IMPROVEMENTS.active
2026-04-02TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$58,447,610PROJECT TITLE: WIDEN ROAD - ADD LANES ON US 77 :::: PROJECT DESCRIPTION: US 77 FROM LEE COUNTY LINE TO SH 71. ADD 2 LANES TO CONVERT TO A 2 LANE TO A 4 LANE DIVIDED FACILITY INCLUDING WIDEN PAVEMENT, MEDIAN CONSTRUCTION, REALIGN OF ROADWAY, PLACEMENT OF ASPHALTIC CONCRETE PAVEMENT, UPGRADE STANDARD, AND PROPOSED DRAINAGE MODIFICATIONS.active
2026-03-18TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$57,086,027PROJECT TITLE: RIGHT OF WAY ACTIVITIES INCLUDING AQUISITION AND ADJUSTMENTS ON US 59. :::: PROJECT DESCRIPTION: US 59 FROM 0.93 MILES SOUTH OF UNIVERSITY BOULEVARD TO 0.51 MILES SOUTH OF SHILOH DRIVE. RIGHT OF WAY ACTIVITIES INCLUDING AQUISITION AND ADJUSTMENTS ON US 59.active
TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$51,593,892PROJECT TITLE: WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. :::: PROJECT DESCRIPTION: SL 1604 FROM IH 10 TO US 281. WIDEN ROAD - ADD LANES.active
TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$51,503,684PROJECT TITLE: WIDEN ROAD AND ADD LANES ON US 377. :::: PROJECT DESCRIPTION: US 377 FROM SOUTH OF FM 1171 TO CRAWFORD ROAD; RECONSTRUCT AND WIDEN ROADWAY FROM 2 LANE TO 4 LANE; SIDEWALKS, TURN LANES, TEXAS U TURN, NEW SIGNAL INSTALLATION WITH RETIMING, AND A GRADE SEPARATION.active
TEXAS DEPARTMENT OF TRANSPORTATIONDepartment of Transportation$34,092,582PROJECT TITLE: ON US 67 AT LAKE RIDGE PARKWAY. CONSTRUCT INTERCHANGE; PHASE 1. :::: PROJECT DESCRIPTION: US 67 AT LAKE RIDGE PARKWAY; INTERCHANGE IMPROVEMENT.transportationactive
Sources
USAspending.gov — all awards for this UEI →SAM.gov entity registration →

Profile compiled from publicly available USAspending.gov records, ingested and entity-resolved by The Buildout's pipeline.