The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$34,092,582

Department of Transportation·Federal Highway Administration

to TEXAS DEPARTMENT OF TRANSPORTATION

ACTION DATE·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22630000Y001TX2013228_069
Award description

PROJECT TITLE: ON US 67 AT LAKE RIDGE PARKWAY. CONSTRUCT INTERCHANGE; PHASE 1. :::: PROJECT DESCRIPTION: US 67 AT LAKE RIDGE PARKWAY; INTERCHANGE IMPROVEMENT.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds Phase 1 construction of an interchange improvement project on US Route 67 at Lake Ridge Parkway in Texas.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterchange-construction
Why this matters

Highway interchange improvements enhance regional traffic flow, safety, and economic connectivity in growing metropolitan areas.

Supply-chain signal

Drives demand for construction materials, heavy equipment, engineering services, and concrete suppliers in the Texas transportation infrastructure market.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002047.

Period of performance
Start
2012-08-30
End
2036-09-01
Status
activein 3760 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.