The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$34,092,582

Department of Transportation·Federal Highway Administration

to TEXAS DEPARTMENT OF TRANSPORTATION

WORK BEGAN2012-08-30·LATEST ACTION·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22630000Y001TX2013228_069
Award description

PROJECT TITLE: ON US 67 AT LAKE RIDGE PARKWAY. CONSTRUCT INTERCHANGE; PHASE 1. :::: PROJECT DESCRIPTION: US 67 AT LAKE RIDGE PARKWAY; INTERCHANGE IMPROVEMENT.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Phase 1 construction of an interchange improvement at US 67 and Lake Ridge Parkway in Texas.

Sub-sectors
highway-constructionfhwa-formula-grantmulti-year-infrastructure
Why this matters

Ongoing FHWA commitment to highway infrastructure; part of a 24-year regional interchange improvement program.

Supply-chain signal

Drives demand for construction contractors, engineering services, and materials suppliers in Texas transportation sector.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-16. Cost: $0.009863.

Period of performance
Start
2012-08-30
End
2036-09-01
Status
activein 3703 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$34.1M Department of Transportation — The Buildout — The Buildout