$144,376,313
to TEXAS DEPARTMENT OF TRANSPORTATION
PROJECT TITLE: FY 2026 STATE PLANNING AND RESEARCH WORK PROGRAM :::: PROJECT DESCRIPTION: FY 2026 STATE PLANNING AND RESEARCH WORK PROGRAM
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds Texas DOT's FY 2026 planning and research work program for highway system analysis and development.
Formula grants to state DOTs support long-term transportation planning that shapes infrastructure investment priorities and regional mobility.
Supports planning that will drive procurement decisions for construction materials, engineering services, and equipment across Texas highway projects.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-24. Cost: $0.002690.
- 2026-07-06PROJECT TITLE: CONVERT NON FREEWAY ON US 59. :::: PROJECT DESCRIPTION: US 59 FROM FM 961 TO CR 456 PIERCE, UPGRADE TO RURAL FREEWAY, FUTURE I 69 CORRIDOR, CONSTRUCT MAIN LANES, FRONTAGE ROADS AND STRUCTURES TO CONVERT 4 LANE DIVIDED HIGHWAY TO 6 LANE DIVIDED FREEWAY WITH 2 LANE FRONTAGE ROADS IN EACH DIRECTION.$226.7M
- 2026-04-02PROJECT TITLE: WIDEN ROAD-ADD LANES ON IH 45. :::: PROJECT DESCRIPTION: IH 45 FROM 0.3 MILES NORTH OF SH 19 TO SH 30; FROM SH 30 TO 0.9 MILES NORTH OF SH 30. WIDEN ROAD - ADD LANES.$115.3M
- 2026-04-17PROJECT TITLE: HIGHWAY IMPROVEMENT ON IH 410. :::: PROJECT DESCRIPTION: IH 410 AT US 281 AND SAN PEDRO; OPERATIONAL IMPROVEMENTS TO INCLUDE DIRECT CONNECTOR IMPROVEMENT FROM US 281 TO IH 410 WEST BOUND; RAMP REVISIONS, FRONTAGE ROAD AND INTERSECTION IMPROVEMENTS.$111.3M
- 2026-05-19PROJECT TITLE: WIDEN ROAD AND ADD LANES ON IH 20. :::: PROJECT DESCRIPTION: IH 20 FROM FM 600 TO SH 351; ADD TWO MAIN LANES FOR A SIX LANE FREEWAY AND CONSTRUCT OVERPASS STRUCTURES.$85.4M
- 2026-04-02PROJECT TITLE: WIDEN ROAD - ADD LANES ON US 77 :::: PROJECT DESCRIPTION: US 77 FROM LEE COUNTY LINE TO SH 71. ADD 2 LANES TO CONVERT TO A 2 LANE TO A 4 LANE DIVIDED FACILITY INCLUDING WIDEN PAVEMENT, MEDIAN CONSTRUCTION, REALIGN OF ROADWAY, PLACEMENT OF ASPHALTIC CONCRETE PAVEMENT, UPGRADE STANDARD, AND PROPOSED DRAINAGE MODIFICATIONS.$58.4M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22530000Y550TX0420226_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.