The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$58,365,654

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001FLD721013_069
Award description

PROJECT TITLE: I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION :::: PROJECT DESCRIPTION: I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds reconstruction and lane additions on Interstate 275/State Road 93 in Florida between I-4 and MLK Boulevard.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterstate-reconstruction
Why this matters

Critical infrastructure improvement on a major interstate corridor serving the Tampa Bay region, enhancing capacity and safety.

Supply-chain signal

Drives demand for construction materials, heavy equipment, asphalt, concrete, and engineering services in the Florida transportation sector.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002110.

Period of performance
Start
End
2029-06-28
Status
activein 1139 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.