The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$116,380,166

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-04-17·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000Y001FLD721035_069
Award description

PROJECT TITLE: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION :::: PROJECT DESCRIPTION: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds reconstruction and lane expansion of US 19 (SR 55) in Florida from Northside Drive to north of CR 95.

Sub-sectors
highway-infrastructurefhwa-formula-grantroad-reconstruction
Why this matters

Improves critical highway corridor capacity and safety in Florida, supporting regional mobility and economic connectivity.

Supply-chain signal

Drives demand for construction materials, heavy equipment, asphalt, concrete, and engineering services in Florida transportation sector.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002112.

Period of performance
Start
End
2027-02-24
Status
activein 284 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.