The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$216,707,246

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000Y001FL0041228_069
Award description

PROJECT TITLE: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB :::: PROJECT DESCRIPTION: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds preliminary engineering and construction of managed lanes on Interstate 4 between Kirkman Road and SR 434 in Florida, including lane additions and roadway reconstruction.

Sub-sectors
highway-infrastructurefhwa-formula-grantmanaged-lanes
Why this matters

I-4 is a critical corridor in central Florida serving major metropolitan areas and tourism; managed lanes improve traffic flow and regional economic connectivity.

Supply-chain signal

Drives demand for construction materials, engineering services, and heavy equipment suppliers supporting highway expansion projects in Florida.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002171.

Period of performance
Start
End
2042-08-30
Status
activein 5950 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.