The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$198,130,242

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-04-17·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001FLD521023_069
Award description

PROJECT TITLE: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds construction improvements to the I-4 and Sand Lake Road interchange in Florida between SR 528 and SR 435.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterchange-improvement
Why this matters

Addresses critical regional traffic congestion on a major interstate corridor serving the Orlando metropolitan area and tourism economy.

Supply-chain signal

Drives demand for construction materials, heavy equipment, engineering services, and local construction labor in central Florida.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002096.

Period of performance
Start
End
2027-12-31
Status
activein 594 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.