The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$81,727,680

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-04-17·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22530000Y001FLD322015_069
Award description

PROJECT TITLE: SR 8 (I-10) @ SR 95 (US 29) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION :::: PROJECT DESCRIPTION: SR 8 (I-10) @ SR 95 (US 29) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds construction to add lanes at the SR 8 (I-10) and SR 95 (US 29) interchange in Florida.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterchange-construction
Why this matters

Improves critical interstate highway capacity and traffic flow in a major Florida corridor.

Supply-chain signal

Drives demand for construction materials, heavy equipment, and engineering services in Florida transportation infrastructure.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002070.

Period of performance
Start
End
2029-12-31
Status
activein 1325 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.