The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$90,377,926

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-04-17·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001FLD220122_069
Award description

PROJECT TITLE: I-95(SR9) FROM SR202(JT BUTLER) TO ATLANTIC BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB :::: PROJECT DESCRIPTION: I-95(SR9) FROM SR202(JT BUTLER) TO ATLANTIC BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds reconstruction and lane additions on I-95 (SR9) between SR202 and Atlantic Boulevard in Florida.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterstate-reconstruction
Why this matters

Critical interstate corridor improvement enhances regional mobility and economic connectivity in Southeast Florida.

Supply-chain signal

Drives demand for construction materials, heavy equipment, and engineering services in Florida transportation sector.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002045.

Period of performance
Start
End
2027-03-16
Status
activein 304 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.