The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$100,071,530

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001FLD720031_069
Award description

PROJECT TITLE: I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB :::: PROJECT DESCRIPTION: I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds construction to add lanes on I-75 interchange near Tampa, Florida, improving traffic flow at the I-4 junction.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterchange-expansion
Why this matters

Interstate highway improvements enhance regional freight mobility and economic connectivity in Florida's major commercial corridor.

Supply-chain signal

Drives demand for construction materials, heavy equipment, and engineering services in Florida's transportation infrastructure sector.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002100.

Period of performance
Start
End
2027-11-22
Status
activein 555 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.