$45,054,489
Department of Transportation·Federal Highway Administration
to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
transportationactive
ACTION DATE—·SOURCEUSASPENDING·SOURCE IDASST_NON_121002062Z001_069
Award description
SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTION
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Funds replacement construction of two bridges on SR-80/Southern Boulevard in Florida.
Sub-sectors
highway-infrastructurebridge-replacementfhwa-formula-grant
Why this matters
Critical infrastructure modernization maintaining regional transportation connectivity and safety standards.
Supply-chain signal
Drives demand for construction materials, engineering services, and heavy equipment suppliers in Florida.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.001915.
Period of performance
Start
—
End
2028-01-21
Status
activein 615 days
Other awards from this recipient
- 2026-04-02PROJECT TITLE: I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB :::: PROJECT DESCRIPTION: I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB$619.1M
- 2026-03-03PROJECT TITLE: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB :::: PROJECT DESCRIPTION: I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB$216.7M
- 2026-04-17PROJECT TITLE: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION :::: PROJECT DESCRIPTION: I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION$198.1M
- 2026-04-17PROJECT TITLE: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION :::: PROJECT DESCRIPTION: US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION$116.4M
- 2026-03-03PROJECT TITLE: I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB :::: PROJECT DESCRIPTION: I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB$108.6M
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_121002062Z001_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.