The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$45,054,489

Department of Transportation·Federal Highway Administration

to STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

ACTION DATE·SOURCEUSASPENDING·SOURCE IDASST_NON_121002062Z001_069
Award description

SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds replacement construction of two bridges on SR-80/Southern Boulevard in Florida.

Sub-sectors
highway-infrastructurebridge-replacementfhwa-formula-grant
Why this matters

Critical infrastructure modernization maintaining regional transportation connectivity and safety standards.

Supply-chain signal

Drives demand for construction materials, engineering services, and heavy equipment suppliers in Florida.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.001915.

Period of performance
Start
End
2028-01-21
Status
activein 615 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.