SOUTHWEST RESEARCH INSTITUTE
...UEIPB11V1KH3KV4·Profile updated 2026-05-13
About this recipient
SOUTHWEST RESEARCH INSTITUTE has received $667.2M in tracked federal funding across the ingest window.
The largest single source of funding is National Aeronautics and Space Administration, which dominates the recipient's federal portfolio. We surface the full breakdown of contracts and grants below.
A longer, LLM-generated profile becomes available for the top entities by total $ awarded. We do not take editorial direction from recipients.
Portfolio by sector
Sectors classified by LLM on each award.
- aerospace4 awards$667.2M 100%
Portfolio status
Based on each award's period of performance.
Active
4
active100% of awards
Expiring (≤90d)
0
expiring · 30d0% of awards
Expired
0
expired0% of awards
No POP
0
—0% of awards
Top awarding agencies
National Aeronautics and Space Administration
$667.2M 100%
Based on 4 awards totaling $667,233,541.
Awards
Top 4 by amount
| Action date | Recipient | Agency | Amount | Description | Sector | Status |
|---|---|---|---|---|---|---|
| — | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $384,632,648 | TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION | — | active |
| — | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $168,112,735 | NEW HORIZON -- PLUTO MISSION PHASE B | — | active |
| — | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $72,431,168 | IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS. | — | active |
| — | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $42,056,990 | DEVELOPMENT OF THE QUICKSOUNDER SC AND THE QUICKSOUNDER SATELLITE, INTEGRATION OF THE ATMS EDU, SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPS & SATELLITE ACTIVATION, 3 YRS OF MISSION OPS & PERFORM DECOMMISSIONING OPERATION | aerospace | active |
Sources
USAspending.gov — all awards for this UEI →SAM.gov entity registration →
Profile compiled from publicly available USAspending.gov records, ingested and entity-resolved by The Buildout's pipeline.