$35,234,258
to SOUTHWEST RESEARCH INSTITUTE
STROFIO - PHASE B IS AWARDED FROM ANNOUNCEMENT OF OPPORTUNITY (AO) NNM08ZDA009O, STAND ALONE MISSION OF OPPORTUNITY NOTICE (SALMON) ISSUED BY NASA HEADQUARTERS. SOUTHWEST RESEARCH INSTITUTE (SWRI) WAS SELECTED FOR "STROFIO: EXOSPHERIC SAMPLING OF MERCURY'S SURFACE COMPOSITION" WITH DR. STEFANO LIVI AS THE PRINCIPAL INVESTIGATOR FOR FUNDING AND APPROVED TO DIRECTLY ENTER PHASE B PRELIMINARY DESIGN AND TECHNOLOGY COMPLETION. STROFIO WAS SELECTED BECAUSE IT IS TIMELY AND TAKES ADVANTAGE OF A UNIQUE OPPORTUNITY FOR NASA TO PARTICIPATE THROUGH THIS INVESTIGATION IN THE BEPICOLOMBO MISSION. THE ANTICIPATED OBSERVATIONS OF MERCURY'S EXOSPHERE WILL BE UNIQUE AND COMPLEMENTARY TO INVESTIGATIONS CONDUCTED BY MARINER, MESSENGER AND THE OTHER INSTRUMENTS ON BEPICOLOMBO. THE PROPOSED INVESTIGATION WILL PROVIDE VALUABLE INFORMATION ABOUT MERCURY'S EXOSPHERE AND ITS INTERACTION WITH THE MAGNETOSPHERE AND SURFACE. THE STROFIO INSTRUMENT WILL PROVIDE A VALUABLE SCIENTIFIC RETURN, ADDRESSING MANY GOALS OF NASAS PLANETARY SCIENCE PROGRAM.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Fund Phase B design and development of the STROFIO instrument to study Mercury's exosphere as part of the BepiColombo mission.
Advances NASA's planetary science program through a unique international collaboration opportunity to characterize Mercury's surface composition and magnetosphere interactions.
Drives demand for specialized space-qualified scientific instrumentation, sensor technology, and aerospace engineering capabilities from SwRI and its subcontractors.
Strengthens U.S. leadership in planetary science and international space exploration partnerships, complementing European-led BepiColombo mission.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002574.
- 2026-04-27TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION$384.6M
- 2026-04-30NEW HORIZON -- PLUTO MISSION PHASE B$168.1M
- 2026-05-06IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS.$72.4M
- 2026-05-06DEVELOPMENT OF THE QUICKSOUNDER SC AND THE QUICKSOUNDER SATELLITE, INTEGRATION OF THE ATMS EDU, SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPS & SATELLITE ACTIVATION, 3 YRS OF MISSION OPS & PERFORM DECOMMISSIONING OPERATION$42.1M
- 2026-03-24LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE$38.0M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_NNM09AA24C_8000_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.