$65,124,600
to DEPARTMENT OF TRANSPORTATION CALIFORNIA
PROJECT TITLE: IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OV :::: PROJECT DESCRIPTION: ON STATE ROUTE: 15. IN RIVERSIDE AND SAN BERNARDINO COUNTIES FROM 1.2 MILE SOUTH OF CANTU-GALLEANO RANCH RD OVERCROSSING IN EASTVALE TO 1.0 MILE NORTH OF BASELINE AVE OVERCROSSING IN FONTANA ADD ONE TO TWO EXPRESS LANES IN EACH DIRECTION BETWEEN CANTU-GALLEANO RANCH ROAD AND FOOTHILL BOULEVARD, ONE AUXILIARY LANE IN EACH DIRECTION BETWEEN SR-60 AND I-10
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds highway expansion on State Route 15 in California to add express and auxiliary lanes across Riverside and San Bernardino counties.
Addresses congestion on a major interstate corridor serving the Inland Empire region, critical for goods movement and regional economic connectivity.
Will increase demand for construction materials, heavy equipment, and engineering services in Southern California highway construction sector.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002236.
- 2026-03-03PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25$300.0M
- 2026-03-03PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26$188.8M
- 2026-03-18PROJECT TITLE: IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS.$184.0M
- 2026-03-03PROJECT TITLE: ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HI :::: PROJECT DESCRIPTION: ON STATE ROUTE: 405. ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HIGHWAY WORKER SAFETY, UPGRADE SAFETY DEVICES, AND UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS. THIS IS A DESIGN-BUILD PROJECT.$175.4M
- 2026-04-02PROJECT TITLE: IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, INCORPORATING AN ADDITIONAL NORTHBOUND TRUCK CLIMBING LANE FROM SR-14 TO CALGROVE BOULEVARD AND AN ADDITIONAL SOUTHBOUND TRUCK CLIMBING LANE FROM PICO CANYON ROAD/LYONS AVENUE TO SR-14. INCLUDES CONSTRUCTION OF ITS HUB ON ROUTE 5, PM 41.4 TO 43.8. EXTEND HOV LANES, ADD TRUCK CLIMBING LANES AND CONSTRUCT ITS HUB.$104.3M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22530000Y001CA0155174_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.