The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$188,785,117

Department of Transportation·Federal Highway Administration

to DEPARTMENT OF TRANSPORTATION CALIFORNIA

ACTION DATE2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22530000Y001CA00PE026_069
Award description

PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds statewide preliminary engineering and planning for California highway projects in fiscal year 2025-26.

Sub-sectors
highway-infrastructurefhwa-formula-grantpreliminary-engineering
Why this matters

Formula grants support foundational design work enabling future highway construction and infrastructure modernization across California.

Supply-chain signal

Preliminary engineering drives demand for consulting firms, design services, and engineering contractors in transportation infrastructure planning.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002016.

Period of performance
Start
2025-06-12
End
2029-06-30
Status
activein 1141 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.