The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$72,343,038

Department of Transportation·Federal Highway Administration

to DEPARTMENT OF TRANSPORTATION CALIFORNIA

ACTION DATE2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22430000YS30CA00PE025_069
Award description

PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds statewide preliminary engineering and planning for California highway projects in fiscal year 2024-25.

Sub-sectors
highway-infrastructurefhwa-formula-grantpreliminary-engineering
Why this matters

Formula grants support foundational design and feasibility work that enables subsequent highway construction and modernization across California's transportation network.

Supply-chain signal

Preliminary engineering work typically precedes procurement of construction materials, equipment, and contractor services for highway projects.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002051.

Period of performance
Start
End
2028-06-30
Status
activein 776 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.