The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$73,594,900

Department of Transportation·Federal Highway Administration

to DEPARTMENT OF TRANSPORTATION CALIFORNIA

ACTION DATE2026-04-02·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000YS30CA0801998_069
Award description

PROJECT TITLE: ALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE RHMA (OGFC), LIGHTING SYSTEM, AND CON :::: PROJECT DESCRIPTION: ON STATE ROUTE: 80. ALAMEDA AND CONTRA COSTA COUNTIES IN ALBANY AND CROCKETT FROM 0.4 MILE SOUTH OF ALAMEDA COUNTY LINE TO 0.2 MILE RHMA (OGFC), LIGHTING SYSTEM, AND CONCRETE BARRIER

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds highway improvements on State Route 80 in California including lighting systems and concrete barriers.

Sub-sectors
highway-infrastructurefhwa-formula-grantstate-dot-funding
Why this matters

Formula grants to state DOTs are core federal infrastructure investment maintaining critical interstate corridors.

Supply-chain signal

Drives demand for highway construction materials, lighting equipment, and concrete barrier suppliers serving California.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002091.

Period of performance
Start
End
2027-07-15
Status
activein 425 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.