The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$85,150,000

Department of Transportation·Federal Highway Administration

to DEPARTMENT OF TRANSPORTATION CALIFORNIA

transportationactiveONGOING · MOD OF 2025 CONTRACT
WORK BEGAN2025-07-24·LATEST ACTION2026-04-02·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22630000Y001CA0054208_069
Award description

PROJECT TITLE: KERN COUNTY NEAR GRAPEVINE FROM 0.3 MILE SOUTH OF GRAPEVINE CREEK BRIDGE TO 0.5 MILE NORTH OF GRAPEVINE ROAD UNDERCROSSING REHABILITATE ROADWAY IN NO :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. KERN COUNTY NEAR GRAPEVINE FROM 0.3 MILE SOUTH OF GRAPEVINE CREEK BRIDGE TO 0.5 MILE NORTH OF GRAPEVINE ROAD UNDERCROSSING REHABILITATE ROADWAY IN NORTHBOUND DIRECTION WITH CONTINUOUSLY REINFORCED CONCRETE PAVEMENT AND JOINTED PLAIN CONCRETE, REPLACE SIGNS, UPGRADE GUARDRAIL AND TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS, AND REHABILITATE DRAINAGE SYSTEMS AND LIGHTING.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

The latest obligation on a 2025 California highway rehabilitation project replaces concrete pavement, guardrails, signs, and drainage systems on State Route 5 near Grapevine.

Sub-sectors
highway-rehabilitationfhwa-formula-grantcalifornia-infrastructure
Why this matters

Maintains critical interstate corridor infrastructure in high-traffic Kern County region; part of ongoing federal highway modernization under formula-grant program.

Supply-chain signal

Drives demand for concrete, steel guardrail materials, traffic management systems, and drainage equipment from regional and national suppliers.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-31. Cost: $0.003041.

Period of performance
Start
2025-07-24
End
2030-10-15
Status
activein 1555 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$85.2M Department of Transportation — The Buildout — The Buildout