$88,514,000
to DEPARTMENT OF TRANSPORTATION CALIFORNIA
PROJECT TITLE: SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 156. SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE CONTROLLED ACCESS HIGHWAY
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds California's widening of State Route 156 from 2 to 4 lanes in San Benito County near San Juan Bautista.
Improves regional highway capacity and safety on a state route serving agricultural and commuter traffic in central California.
Will drive demand for construction materials, engineering services, and heavy equipment suppliers in the California transportation sector.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002215.
- 2026-03-03PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25$300.0M
- 2026-03-03PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26$188.8M
- 2026-03-18PROJECT TITLE: IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS.$184.0M
- 2026-03-03PROJECT TITLE: ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HI :::: PROJECT DESCRIPTION: ON STATE ROUTE: 405. ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HIGHWAY WORKER SAFETY, UPGRADE SAFETY DEVICES, AND UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS. THIS IS A DESIGN-BUILD PROJECT.$175.4M
- 2026-04-02PROJECT TITLE: IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, INCORPORATING AN ADDITIONAL NORTHBOUND TRUCK CLIMBING LANE FROM SR-14 TO CALGROVE BOULEVARD AND AN ADDITIONAL SOUTHBOUND TRUCK CLIMBING LANE FROM PICO CANYON ROAD/LYONS AVENUE TO SR-14. INCLUDES CONSTRUCTION OF ITS HUB ON ROUTE 5, PM 41.4 TO 43.8. EXTEND HOV LANES, ADD TRUCK CLIMBING LANES AND CONSTRUCT ITS HUB.$104.3M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22330000Y001CAP156024_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.