$88,514,000
to DEPARTMENT OF TRANSPORTATION CALIFORNIA
PROJECT TITLE: SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 156. SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 WIDEN 2-LANE HIGHWAY TO 4-LANE CONTROLLED ACCESS HIGHWAY
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Federal highway formula grant to California for widening State Route 156 from 2-lane to 4-lane controlled-access highway in San Benito County.
Improves regional traffic capacity and safety on a state route serving San Juan Bautista; part of ongoing federal-state highway modernization.
Will generate demand for construction materials, heavy equipment rental, and engineering/construction labor in California's Central Valley region.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-30. Cost: $0.002919.
- 2026-03-03PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25$300.0M
- 2026-03-03PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26$188.8M
- 2026-03-18PROJECT TITLE: IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS.$184.0M
- 2026-03-03PROJECT TITLE: ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HI :::: PROJECT DESCRIPTION: ON STATE ROUTE: 405. ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HIGHWAY WORKER SAFETY, UPGRADE SAFETY DEVICES, AND UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS. THIS IS A DESIGN-BUILD PROJECT.$175.4M
- 2026-04-02PROJECT TITLE: IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, INCORPORATING AN ADDITIONAL NORTHBOUND TRUCK CLIMBING LANE FROM SR-14 TO CALGROVE BOULEVARD AND AN ADDITIONAL SOUTHBOUND TRUCK CLIMBING LANE FROM PICO CANYON ROAD/LYONS AVENUE TO SR-14. INCLUDES CONSTRUCTION OF ITS HUB ON ROUTE 5, PM 41.4 TO 43.8. EXTEND HOV LANES, ADD TRUCK CLIMBING LANES AND CONSTRUCT ITS HUB.$104.3M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22330000Y001CAP156024_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.