The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$100,000,000

Department of Transportation·Federal Highway Administration

to DEPARTMENT OF TRANSPORTATION CALIFORNIA

transportationactiveONGOING · MOD OF 2019 CONTRACT
WORK BEGAN2019-03-22·LATEST ACTION2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22530000Y113CA6003029_069
Award description

PROJECT TITLE: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B1 - CONSTRUCTION :::: PROJECT DESCRIPTION: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B1 - CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Latest obligation on the Golden Gate Bridge seismic retrofit Phase 3B1 construction, which began in 2019.

Sub-sectors
highway-infrastructureseismic-retrofitbridge-safety
Why this matters

Strengthens a critical West Coast transportation corridor against earthquake risk; protects $1.3B+ daily economic activity across the Bay Area.

Supply-chain signal

Sustains demand for specialized seismic engineering, steel fabrication, and heavy construction equipment suppliers over the 2019–2032 project lifecycle.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-28. Cost: $0.002850.

Period of performance
Start
2019-03-22
End
2032-03-31
Status
activein 2088 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$100.0M Department of Transportation — The Buildout — The Buildout