The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$100,000,000

Department of Transportation·Federal Highway Administration

to DEPARTMENT OF TRANSPORTATION CALIFORNIA

ACTION DATE2026-03-03·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22530000Y113CA6003029_069
Award description

PROJECT TITLE: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B1 - CONSTRUCTION :::: PROJECT DESCRIPTION: GOLDEN GATE BRIDGE SEISMIC RETROFIT PHASE - 3B1 - CONSTRUCTION

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds Phase 3B1 construction for seismic retrofit of the Golden Gate Bridge to improve structural resilience.

Sub-sectors
highway-infrastructurebridge-seismic-safetyfhwa-formula-grant
Why this matters

Critical infrastructure hardening against earthquake risk in a major metropolitan area and strategic transportation corridor.

Supply-chain signal

Drives demand for specialized seismic engineering, steel reinforcement, construction materials, and heavy equipment suppliers.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002067.

Period of performance
Start
2019-03-22
End
2032-03-31
Status
activein 2146 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.