$62,941,704
to DEPARTMENT OF TRANSPORTATION CALIFORNIA
PROJECT TITLE: IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE :::: PROJECT DESCRIPTION: ON STATE ROUTE: 99. IN SACRAMENTO COUNTY IN AND NEAR ELK GROVE FROM 0.3 MILE SOUTH OF DILLARD ROAD OVERCROSSING TO 0.6 MILE SOUTH OF GRANT LINE ROAD. REMOVE AND REPLACE COSUMNES RIVER AND COSUMNES RIVER OVERFLOW BRIDGES.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Replace two bridges on State Route 99 in Sacramento County, California spanning the Cosumnes River and its overflow.
Maintains critical regional highway infrastructure in a major agricultural and commercial corridor serving the Central Valley.
Drives demand for bridge construction materials, engineering services, and heavy equipment rental in Northern California.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002131.
- 2026-03-03PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25$300.0M
- 2026-03-03PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2025-26$188.8M
- 2026-03-18PROJECT TITLE: IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS :::: PROJECT DESCRIPTION: ON STATE ROUTE: 10. IN RIVERSIDE COUNTY FROM 1.05 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE. REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS.$184.0M
- 2026-03-03PROJECT TITLE: ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HI :::: PROJECT DESCRIPTION: ON STATE ROUTE: 405. ON INTERSTATE 405, IN AND NEAR IRVINE AND CONSTA MESA, FROM ROUTE 5 TO HARBOR BLVD REHAB PAVEMENT, REPLACE SLABS, UPGRADE BRIDGE RAILINGS, IMPROVE HIGHWAY WORKER SAFETY, UPGRADE SAFETY DEVICES, AND UPGRADE TRANSPORTATION MANAGEMENT SYSTEM (TMS) ELEMENTS. THIS IS A DESIGN-BUILD PROJECT.$175.4M
- 2026-04-02PROJECT TITLE: IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, IN :::: PROJECT DESCRIPTION: ON STATE ROUTE: 5. IN LOS ANGELES COUNTY ON ROUTE 5, PM R45.0 TO R59.6, EXTEND THE HOV LANES FROM THE SR-14 INTERCHANGE TO JUST SOUTH OF THE PARKER ROAD INTERCHANGE, INCORPORATING AN ADDITIONAL NORTHBOUND TRUCK CLIMBING LANE FROM SR-14 TO CALGROVE BOULEVARD AND AN ADDITIONAL SOUTHBOUND TRUCK CLIMBING LANE FROM PICO CANYON ROAD/LYONS AVENUE TO SR-14. INCLUDES CONSTRUCTION OF ITS HUB ON ROUTE 5, PM 41.4 TO 43.8. EXTEND HOV LANES, ADD TRUCK CLIMBING LANES AND CONSTRUCT ITS HUB.$104.3M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22530000Y113CAP099663_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.