WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
...UEIPDARJGK7FKC7·Profile updated 2026-05-15
Awards tracked
8
Total amount
$1.4B
Date range
2026-03-09 → 2026-07-02
Primary sector
Volume
$/month, last 24
About this recipient
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY has received $1.4B in tracked federal funding across the ingest window.
The largest single source of funding is Department of Transportation, which dominates the recipient's federal portfolio. We surface the full breakdown of contracts and grants below.
A longer, LLM-generated profile becomes available for the top entities by total $ awarded. We do not take editorial direction from recipients.
Portfolio by sector
Sectors classified by LLM on each award.
- transportation19 awards$3.4B 100%
Portfolio status
Based on each award's period of performance.
Active
4
active50% of awards
Expiring (≤90d)
1
expiring · 30d13% of awards
Expired
3
expired38% of awards
No POP
0
—0% of awards
Top awarding agencies
Department of Transportation
$1.4B 100%
Based on 8 awards totaling $1,356,755,980.
Awards
Top 8 by amount
| Action date | Recipient | Agency | Amount | Description | Sector | Status |
|---|---|---|---|---|---|---|
| 2026-04-13 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $301,321,807 | THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA) IS APPLYING FOR $102400000 IN FFY2022 SECTION 5337 STATE OF GOOD REPAIR (SOGR) PROGRAM FUNDS APPORTIONED TO THE URBANIZED AREA (UZA). THIS REQUEST IS CONSISTENT WITH THE SUBALLOCATION OF FUNDS AS AGREED TO AMONG THE THREE RECIPIENTS WITHIN THE UZA OF THE DISTRICT OF COLUMBIA VIRGINIA AND MARYLAND. WMATAS SPLIT LETTER IS ATTACHED TO THIS APPLICATION. THIS REQUEST IS COMPRISED OF $5150378 IN HIGH INTENSITY MOTORBUS (HIMB) FUNDING AND $97249622 IN SOGR FORMULA FUNDING. THESE FUNDS REQUIRE A 20% LOCAL MATCH IN THE AMOUNT OF $25600000. THE NON-FEDERAL SHARE WILL BE PROVIDED BY THE DISTRICT OF COLUMBIA THE STATE OF MARYLAND AND PARTICIPATING JURISDICTIONS IN THE COMMONWEALTH OF VIRGINIA. WMATAS CURRENT TRANSIT ASSET MANAGEMENT (TAM) PLAN WAS ADOPTED ON OCTOBER 21 2018 AND WILL BE UPDATED IN ACCORDANCE WITH CURRENT REGULATIONS BY OCTOBER 2022. PROJECTS INCLUDED HEREIN REFLECT THE GOALS OF THE TAM PLAN. THE APPLICATIONS FUNDS THE PROJECTS AND ACTIVITIES LISTED BELOW. PURPOSE OF AWARD: THE PURPOSE OF THIS AWARD IS TO PROVIDE ROUTINE AND SCHEDULED PREVENTIVE MAINTENANCE OF METROS SYSTEM TRACK AND STRUCTURES AND METRO RAILCAR FLEET. ACTIVITIES TO BE PERFORMED: WMATA WILL CONDUCT ROUTINE AND SCHEDULED MAINTENANCE OF METROS RAILCAR FLEET AND PREVENTIVE MAINTENANCE OF TRACK ALONG THE MAINLINE AND YARDS AND REHABILITATION OF TRACK STRUCTURES. EXPECTED OUTCOME: WMATA WILL PROVIDE SAFE AND RELIABLE RAIL TRANSIT SYSTEM FOR ITS CUSTOMERS AND WMATA EMPLOYEES AND PROVIDE MODERN OPERATIONAL FACILITIES FOR MAINTAINING ASSETS AND RAIL OPERATIONS AND ENSURE A STATE OF GOOD REPAIR OF ITS ASSETS. INTENDED BENEFICIARIES: WMATAS BENEFICIARIES ARE WMATA EMPLOYEES AND WMATA CUSTOMERS WHO COMMUTE WITHIN OR CONNECT TO PUBLIC TRANSIT WITHIN THE DISTRICT OF COLUMBIA VIRGINIA AND MARYLAND REGION. SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS ASSOCIATED WITH THIS AWARD. | — | expired |
| 2026-03-30 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $242,155,926 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO ENSURE STATE OF GOOD REPAIR AND SAFETY OF METRO RAIL STATIONS FACILITIES AND SYSTEMS AND ITS CUSTOMERS.; ACTIVITIES PERFORMED: CARRY OUT ROUTINE AND SCHEDULED PREVENTIVE MAINTENANCE OF METROS SYSTEM TRACK AND STRUCTURES AND METRO RAILCAR FLEETS REHABILITATE PARKING FACILITIES REPLACE METRO STATION SECURITY GATES AND REHABILITATE METRO STATION COOLING SYSTEMS. ACTIVITIES INCLUDE ACQUISITION OF EQUIPMENT AND MATERIALS AND CONSTRUCTION/IMPLEMENTATION OF PROPOSED PROJECTS.; EXPECTED OUTCOMES: WMATA WILL PROVIDE SAFE AND RELIABLE RAIL TRANSIT SYSTEM FOR ITS CUSTOMERS AND WMATA EMPLOYEES AND PROVIDE MODERN OPERATIONAL FACILITIES FOR MAINTAINING ASSETS AND RAIL OPERATIONS AND ENSURE A STATE OF GOOD REPAIR OF ITS ASSETS.; INTENDED BENEFICIARIES: WMATAS BENEFICIARIES ARE WMATA EMPLOYEES AND WMATA CUSTOMERS WHO COMMUTE WITHIN OR CONNECT TO PUBLIC TRANSIT WITHIN THE DISTRICT OF COLUMBIA VIRGINIA AND MARYLAND REGION; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS ASSOCIATED WITH THIS AWARD. | — | active |
| 2026-07-02 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $191,964,505 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO ENSURE STATE OF GOOD REPAIR AND SAFETY AT WMATAS METRORAIL STATIONS FACILITIES AND ON ITS SYSTEMS FOR CUSTOMERS AND PERSONNEL.; ACTIVITIES PERFORMED: ACTIVITIES WILL INCLUDE REPLACEMENT OF ESCALATORS IMPROVEMENTS TO WMATAS RAIL YARDS INCLUDING DULLES TO SUPPORT OPERATIONS AND RAILCAR SCHEDULED MAINTENANCE REPAIR AND/OR REHABILITATE TRACTION POWER INFRASTRUCTURE REPLACEMENT OF BUS SHELTERS AT METRO STATIONS AND REHABILITATION OF RAIL STATIONS PLATFORMS AND STRUCTURES.; EXPECTED OUTCOMES: THESE PROJECTS WILL INCREASE METRORAIL SAFETY AND RELIABILITY FOR WMATA CUSTOMERS AND EMPLOYEES CONTINUING TO PROVIDE MODERN TRANSIT OPERATIONS WHILE ENSURING WMATAS FACILITIES SYSTEMS AND ASSETS ARE IN A STATE OF GOOD REPAIR OF ITS ASSETS.; INTENDED BENEFICIARIES: INTENDED BENEFICIARIES ARE WMATA PERSONNEL WHO MAINTAIN AND OPERATE THE METRORAIL SYSTEM AND WMATA CUSTOMERS WHO COMMUTE WITHIN OR CONNECT TO PUBLIC TRANSIT WITHIN THE NATIONAL CAPITAL REGION.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS ASSOCIATED WITH THIS AWARD. | transportation | active |
| 2026-03-30 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $174,395,636 | APPLICATION PURPOSE: PURPOSE OF THE APPLICATION IS TO ENSURE SAFE AND RELIABLE MODERNIZATION OF FACILITIES AND REPLACEMENT OF VEHICLES WHICH ARE PAST THEIR USEFUL LIFE AND TO IMPLEMENT SAFETY SYSTEMS IMPROVEMENTS FOR OPERATIONS AND CUSTOMERS.; ACTIVITIES PERFORMED: ACTIVITIES INCLUDE THE REPLACEMENT OF THE BLADENSBURG AND NORTHERN BUS GARAGES WHICH INCLUDE OPERATIONS AND MAINTENANCE FOR BATTERY ELECTRIC BUSES THE INSTALLATION OF BUS BARRIERS ACROSS THE METRO BUS FLEET AND REPLACEMENT OF PARATRANSIT VEHICLES WHICH HAVE MET THEIR USEFUL LIFE.; EXPECTED OUTCOMES: THE OUTCOMES AND BENEFITS ARE TO PROVIDE METRO CUSTOMERS SAFE AND RELIABLE PARATRANSIT SERVICE IMPROVE SAFETY OF BUS OPERATORS IMPROVE OPERATIONS OF BUS GARAGES AND IMPROVE SAFETY AND SECURITY OF METRO ASSETS AND ITS CUSTOMERS.; INTENDED BENEFICIARIES: BENEFICIARIES ARE WMATAS EMPLOYEES WHO WORK WITHING THE METRO SYSTEM AND CUSTOMERS WHO COMMUTE WITHIN OR CONNECT TO PUBLIC TRANSIT WITH THE DC-VA-MD UZA.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS ASSOCIATED WITH THIS AWARD. | — | active |
| 2026-03-09 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $143,499,868 | APPLICATION PURPOSE: THE PURPOSE OF THIS AWARD IS TO COMPLETE PHASE 4 OF METRO PLATFORM REHABILITATION PROGRAM AND LIFECYCLE REHABILITATION OR REPLACEMENT OF ELEVATORS ESCALATORS AND AUTOMATIC TRAIN CONTROL SYSTEMS AND IMPLEMENT RADIO/CELLULAR IMPROVEMENTS UPGRADES OF SUPPORT FACILITY FIRE SYSTEM REHABILITATION AND OF TUNNEL WATER LEAK MITIGATION.; ACTIVITIES PERFORMED: ACTIVITIES INCLUDE NECESSARY SAFETY REPAIRS AND REHABILITATION OF METRO STATION PLATFORMS AT FIVE STATIONS LOCATED ON THE WMATA ORANGE LINE IN NE WASHINGTON DC AND PRINCE GEORGES COUNTY MARYLAND; CONDUCT WATER MITIGATION WORK ALONG TWO-SEGMENTS OF THE RED LINE; AND SYSTEMWIDE IMPROVEMENTS TO REHABILITATE REPAIR UPGRADE OR REPLACE SYSTEM ESCALATORS AND ELEVATORS METROS RADIO SYSTEM AND ATC ROOM SAFETY CRITICAL EQUIPMENT.; EXPECTED OUTCOMES: CONTINUE TO PROVIDE CLEAN SAFE AND RELIABLE TRANSPORTATION AND ENSURE WMATA TRANSIT SYSTEMS ARE IN A STATE OF GOOD REPAIR.; INTENDED BENEFICIARIES: WMATAS BENEFICIARIES ARE WMATA EMPLOYEES AND WMATA CUSTOMERS WHO COMMUTE WITHIN OR CONNECT TO PUBLIC TRANSIT WITHIN THE DISTRICT OF COLUMBIA VIRGINIA AND MARYLAND REGION.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS ASSOCIATED WITH THIS AWARD. | — | expired |
| 2026-03-23 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $115,318,260 | APPLICATION PURPOSE: THE PURPOSE IS TO CONTINUE ONGOING BUS PREVENTIVE MAINTENANCE AND REHABILITATION ADD SECURITY SYSTEMS AND ENTERPRISE VIDEO SYSTEMS AND IMPROVE ADA ACCESSIBILITY AT LENFANT PLAZA.; ACTIVITIES PERFORMED: ACTIVITIES INCLUDE ONGOING PREVENTIVE MAINTENANCE AND REHABILITATION OF BUSES TO MAINTAIN THE METRO FLEET IN A STATE OF GOOD REPAIR SECURITY SYSTEM IMPROVEMENTS MTPD PROJECTS AND THE INSTALLATION OF A NEW ELEVATOR AND STAIRS AT LENFANT PLAZA.; EXPECTED OUTCOMES: THE BENEFITS WILL ENSURE CONTINUED SAFE AND RELIABLE BUS TRANSPORTATION FOR THE PUBLIC IMPROVE ADA ACCESSIBILITY AND IMPROVE SAFETY AND SECURITY OF METRO ASSETS AND ITS CUSTOMERS; INTENDED BENEFICIARIES: AWARD BENEFICIARIES ARE WMATAS EMPLOYEES AND CUSTOMERS WHO COMMUTE WITHIN OR CONNECT TO PUBLIC TRANSIT WITH THE DC-VA-MD UZA.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS | — | active |
| 2026-05-18 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $106,878,552 | THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA) IS APPLYING FOR $125511868 IN FFY2022 SECTION 5337 STATE OF GOOD REPAIR FUNDS APPORTIONED TO THE WASHINGTON DC URBANIZED AREA (UZA FOR REHABILITATION OF YELLOW LINE BRIDGE AND TUNNEL REHABILITATION OF BRIDGE STRUCTURES AND CONSTRUCTION OF A HEAVY REPAIR OVERHAUL FACILITY (HRO). THIS REQUEST IS CONSISTENT WITH THE SUBALLOCATION OF FUNDS AGREED TO AMONG THE THREE RECIPIENTS WITHIN UZA8 INCLUDING THE DISTRICT OF COLUMBIA VIRGINIA AND STATE OF MARYLAND. WMATAS SPLIT LETTER IS ATTACHED TO THIS APPLICATION. THESE FUNDS REQUIRE A 20% LOCAL MATCH IN THE AMOUNT OF $31377967. THE NON-FEDERAL SHARE WILL BE PROVIDED BY THE DISTRICT OF COLUMBIA AND THE STATE OF MARYLAND AND PARTICIPATING JURISDICTIONS IN THE COMMONWEALTH OF VIRGINIA. WMATAS CURRENT TRANSIT ASSET MANAGEMENT (TAM) PLAN WAS ADOPTED ON OCTOBER 21 2018 AND WILL BE UPDATED IN ACCORDANCE WITH CURRENT REGULATIONS BY OCTOBER 2022. PROJECTS INCLUDED HEREIN REFLECT THE GOALS OF THE TAM PLAN. THIS REQUEST SUPPORTS THE BELOW PROJECTS. PURPOSE OF AWARD: THE PURPOSE IS TO SUPPORT WMATAS CAPITAL IMPROVEMENT PROGRAM FOR FY2023 INCLUDING THE REHABILITATION OF THE YELLOW LINE BRIDGE AND TUNNEL THE REHABILITATION OF TRACK AND PEDESTRIAN BRIDGES TO A STATE OF GOOD REPAIR AND THE CONSTRUCTION OF THE HRO FACILITY.ACTIVITIES TO BE PERFORMED: ACTIVITIES INCLUDE THE REHABILITATION OF YELLOW LINE BRIDGE REPLACEMENT OF THE L-LINE DRY STANDPIPE AND TUNNEL STEEL LINER; STRUCTURAL REPAIRS TO TWENTY BRIDGES (TRACK AND PEDESTRIAN); AND THE CONSTRUCTION OF THE HRO FACILITY FOR MAINTENANCE AND STORAGE OF THE RAIL FLEET AND ADMINISTRATIVE RAIL OPERATIONS.EXPECTED OUTCOME: THE PROJECTS WILL INCREASE SAFETY AND RELIABILITY OF THE RAIL TRANSIT SYSTEM FOR ITS CUSTOMERS AND WMATA EMPLOYEES AND PROVIDE FOR MODERN AND SAFE RAIL OPERATIONS. INTENDED BENEFICIARIES: WMATAS BENEFICIARIES ARE WMATA EMPLOYEES AND WMATA CUSTOMERS WHO COMMUTE WITHIN OR CONNECT TO PUBLIC TRANSIT WITHIN THE DISTRICT OF COLUMBIA VIRGINIA AND MARYLAND REGION. SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS ASSOCIATED WITH THIS AWARD. | — | expired |
| 2026-05-13 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $81,221,426 | THE PURPOSE OF THIS TASK ORDER IS THAT THE CONTRACTOR SHALL PROVIDE FEDERAL EMPLOYEES THE MEANS TO OBTAIN SPECIFIC TRANSIT BENEFITS WITHIN THE NATIONAL CAPITOL REGION (NCR) THROUGH THE SMART BENEFIT PROGRAM IN ACCORDANCE WITH THE STATEMENT OF WORK. | — | expiring · 79d |
Sources
USAspending.gov — all awards for this UEI →SAM.gov entity registration →
Profile compiled from publicly available USAspending.gov records, ingested and entity-resolved by The Buildout's pipeline.