WASHINGTON ST DEPARTMENT OF TRANSPORTATION
...UEIFCT9KQ8L2574·Profile updated 2026-05-13
Awards tracked
3
Total amount
$144.6M
Date range
2026-04-17 → 2026-04-17
Primary sector
Volume
—
$/month, last 24
About this recipient
WASHINGTON ST DEPARTMENT OF TRANSPORTATION has received $144.6M in tracked federal funding across the ingest window.
The largest single source of funding is Department of Transportation, which dominates the recipient's federal portfolio. We surface the full breakdown of contracts and grants below.
A longer, LLM-generated profile becomes available for the top entities by total $ awarded. We do not take editorial direction from recipients.
Portfolio by sector
Sectors classified by LLM on each award.
- transportation5 awards$224.7M 100%
Portfolio status
Based on each award's period of performance.
Active
3
active100% of awards
Expiring (≤90d)
0
expiring · 30d0% of awards
Expired
0
expired0% of awards
No POP
0
—0% of awards
Top awarding agencies
Department of Transportation
$144.6M 100%
Based on 3 awards totaling $144,620,127.
Awards
Top 3 by amount
| Action date | Recipient | Agency | Amount | Description | Sector | Status |
|---|---|---|---|---|---|---|
| 2026-04-17 | WASHINGTON ST DEPARTMENT OF TRANSPORTATION | Department of Transportation | $64,500,000 | PROJECT TITLE: SR 167/SR 161 TO SR 410 - REBUILD INTERCHANGE :::: PROJECT DESCRIPTION: MODIFY THE DECK OF PUYALLUP RIVER BRIDGE 167/20E AT SR 167/MERIDIAN AVE. MP 6.40B. THIS INCLUDES REMOVING THE EXISTING SIDEWALK, ADDING BARRIER SEPARATION FOR A NEW SHARED USE PATH, AND RESURFACING FOR THE SHARED USE PATH. ADD TWO NEW STRUCTURES. DISPOSE OF THE OLD STEEL TRUSS PUYALLUP RIVER BRIDGE 167/20E. | — | active |
| — | WASHINGTON ST DEPARTMENT OF TRANSPORTATION | Department of Transportation | $40,756,263 | PROJECT TITLE: I-5/SB DENNY WAY TO NE 117TH ST - PAVEMENT, DECK, EXPANSION JOINTS, & DRAINAGE :::: PROJECT DESCRIPTION: CONCRETE PAVEMENT & EXPANSION JOINT REPLACEMENTS, AND DECK SEAL | — | active |
| — | WASHINGTON ST DEPARTMENT OF TRANSPORTATION | Department of Transportation | $39,363,864 | PROJECT TITLE: I-5/SB DENNY WAY TO NE 117TH ST - PAVEMENT, DECK, EXPANSION JOINTS, & DRAINAGE :::: PROJECT DESCRIPTION: CONCRETE PAVEMENT & EXPANSION JOINT REPLACEMENTS, AND DECK SEAL | — | active |
Sources
USAspending.gov — all awards for this UEI →SAM.gov entity registration →
Profile compiled from publicly available USAspending.gov records, ingested and entity-resolved by The Buildout's pipeline.