| Action date | Recipient | Agency | Amount | Description | Sector |
|---|---|---|---|---|---|
| 2026-05-07 | L3HARRIS TECHNOLOGIES, INC. | National Aeronautics and Space Administration | $372,589,497 | OPTICAL TELESCOPE ASSEMBLY (OTA) THIS CONTRACT PROVIDES FOR ALL EFFORTS AND RESPONSIBILITIES FOR THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO BUILD, REFURBISH, OR MODIFY THE OTA AS REQUIRED TO MEET THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) PERFORMANCE REQUIREMENTS. | aerospace |
| 2026-06-30 | LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC | National Aeronautics and Space Administration | $363,181,982 | THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE. | aerospace |
| 2026-06-25 | AIR PRODUCTS AND CHEMICALS, INC | National Aeronautics and Space Administration | $353,792,394 | THIS DELIVERY ORDER IS ISSUED PURSUANT TO THE SCHEDULE OF SUPPLIES, CONTRACT PERIOD PRICING, OTHER PRICING OPTIONS, AND TERMS AND CONDITIONS OF CONTRACT 80KSC023DA010 FOR HELIUM AT KENNEDY SPACE CENTER. | aerospace |
| 2026-06-30 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $350,834,981 | THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT. | aerospace |
| 2026-06-17 | L3HARRIS TECHNOLOGIES, INC. | National Aeronautics and Space Administration | $343,955,638 | GEOXO IMAGER (GXI) INSTRUMENT IMPLEMENTATION | aerospace |
| 2026-06-17 | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | $325,884,715 | TAS::80 0114::TAS SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT. THIS CONTRACT IS FOR THE DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE SUVI IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE SUVI INSTRUMENT PROVIDES A BROADBAND IMAGING IN THE EXTREME ULTRAVIOLET WAVELENGTH RANGE TO MONITOR THE ENTIRE DYNAMIC RANGE OF SOLAR FEATURES, FROM CORONAL HOLES TO FLARES, AS WELL AS THE ESTIMATE OF TEMPERATURE AND EMISSION MEASURE. THESE DATA ARE USED FOR GEOMAGNETIC STORM FORECASTS AND FORECASTS OF SOLAR ENERGETIC PARTICLE EVENTS RELATED TO FLARES. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE SUVI FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO SUVI EMULATORS (SUVIES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL SUVI MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS | aerospace |
| 2026-06-18 | ASTROBOTIC TECHNOLOGY INC | National Aeronautics and Space Administration | $314,011,569 | VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY | aerospace |
| 2026-05-21 | BAE SYSTEMS SPACE & MISSION SYSTEMS INC. | National Aeronautics and Space Administration | $307,797,674 | THE WOMA REQUIREMENT WAS ISSUED AS A FULL AND OPEN COMPETITIVE PROCUREMENT TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, AND EVALUATE THE WIDE FIELD INSTRUMENT (WFI) OPTO-MECHANICAL ASSEMBLY (WOMA) FOR THE WIDE FIELD INFRARED SURVEY TELESCOPE (WFIRST) MISSION. IN ADDITION, IT DEFINES THE TASKS NECESSARY TO SUPPORT THE SUBSEQUENT INTEGRATION, TEST, EVALUATION, AND VALIDATION OF THE WFI. IT DEFINES THE POST-DELIVERY SUPPORT TO PAYLOAD AND OBSERVATORY INTEGRATION AND TEST, AND TO PRE-LAUNCH, LAUNCH AND COMMISSIONING ACTIVITIES AT THE MISSION OPERATIONS CENTER (MOC) AND TO SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE). | aerospace |
| 2026-06-29 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $306,834,125 | MARS SCIENCE LABORATORY 67-8636 | aerospace |
| 2026-06-01 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $303,779,748 | SURFACE WATER AND OCEAN TOPOGRAPHY (SWOT) 83-16443 | aerospace |
| 2026-06-09 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $300,982,194 | RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUATION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAVEN PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM, WHICH CONSISTS OF THE INTEGRATED SPACECRAFT AND SCIENCE PAYLOADS IN ACCORDANCE WITH THE STATEMENT OF WORK. | aerospace |
| 2026-06-26 | AEROJET ROCKETDYNE, INC. | National Aeronautics and Space Administration | $287,084,371 | EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT. | aerospace |
| 2026-07-02 | SPACE NETWORK SOLUTIONS LLC | National Aeronautics and Space Administration | $278,765,841 | THE PRINCIPAL PURPOSE OF THIS FOLLOW-ON CONTRACT IS TO PROVIDE MULTIDISCIPLINE ENGINEERING SUPPORT SERVICES. | aerospace |
| 2026-06-05 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $271,181,402 | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 1 (MAINTENANCE). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR) CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER) TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]) RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]) AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | aerospace |
| 2026-05-20 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $269,744,348 | SPHEREX:AN ALL-SKY SPECTRAL SURVEY 71-700089 | aerospace |
| 2026-06-27 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $258,697,495 | SURFACE BIOLOGY & GEOLOGY (SBG): PRE-PHASE A AND PHASE A PLAN | aerospace |
| 2026-06-05 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $258,183,242 | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 2 (OPERATIONS). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | aerospace |
| 2026-06-17 | ADNET SYSTEMS INC | National Aeronautics and Space Administration | $257,624,996 | SPACE AND EARTH SCIENCES DATA ANALYSIS (SESDA V) | aerospace |
| 2026-06-25 | TELEDYNE BROWN ENGINEERING, INC. | National Aeronautics and Space Administration | $257,267,747 | MARSHALL OPERATIONS SYSTEMS, SERVICES, AND INTEGRATION II (MOSSI II) | aerospace |
| 2026-06-24 | RAYTHEON COMPANY | National Aeronautics and Space Administration | $257,032,016 | EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS) EVOLUTION AND DEVELOPMENT (EED)-3 EOSDIS EED-3 SERVICES | aerospace |
| 2026-06-09 | MITCHELL VANTAGE SYSTEMS LLC | National Aeronautics and Space Administration | $254,855,719 | UNDER THIS SES III CONTRACT, THE SOFTWARE ENGINEERING DIVISION (SED) OF THE ENGINEERING AND TECHNOLOGY DIRECTORATE (ETD) PROVIDES QUALITY SOFTWARE PRODUCTS, SERVICES AND EXPERTISE TO ENSURE THE SUCCESS OF NASA MISSIONS AND STAKEHOLDERS. | aerospace |
| 2026-06-18 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $234,005,001 | IGF::OT::IGF NASA AMES RESEARCH CENTER FACILITIES MAINTENANCE SUPPORT SERVICES CONTRACT THE NASA AMES FACILITIES MAINTENANCE SUPPORT SERVICES (AFSS) CONTRACT WILL PROVIDE THE PLANNING, IMPLEMENTATION, AND EXECUTION OF A COMPREHENSIVE RELIABILITY CENTERED MAINTENANCE (RCM) PROGRAM FOR ARC COVERING THE FOLLOWING TECHNICAL AREAS: ELECTRICAL, MECHANICAL, PLUMBING, PIPEFITTING, INFRASTRUCTURE UTILITY SERVICES HEATING, VENTILATING, AIR CONDITIONING, AND REFRIGERATION (HVAC/R) SERVICES ENVIRONMENTAL SERVICES MAINTENANCE ENGINEERING, GROUNDS MAINTENANCE, AND BUILDING TRADE SERVICES. THE CENTRAL FOCUS OF THE MAINTENANCE PROGRAM WILL BE THE IMPLEMENTATION OF RCM STRATEGIES TO DETERMINE THE OPTIMUM MIX OF PREVENTIVE, PROGRAMMED, PREDICTIVE, REACTIVE, AND PROACTIVE MAINTENANCE PRACTICES IN AN EFFORT TO PROVIDE EFFICIENT AND EFFECTIVE OPERATIONS AND MAINTENANCE SERVICES. THE FACILITIES SUPPORT SERVICES PROCURED THROUGH THIS EFFORT WILL PERFORM MAINTENANCE FOR ALL FACILITIES AT ARC, EXCEPT FOR NON-INFRASTRUCTURE RELATED SYSTEMS INSIDE WIND TUNNELS. | aerospace |
| 2026-06-24 | AEROJET ROCKETDYNE, INC. | National Aeronautics and Space Administration | $232,928,992 | IGF::OT::IGF NASA, THROUGH THE SPACE TECHNOLOGY MISSION DIRECTORATE (STMD,) SEEKS TO DEMONSTRATE AN ADVANCED SOLAR ELECTRIC PROPULSION (EP) SYSTEM THAT WILL ENABLE FUTURE DEEP SPACE HUMAN AND ROBOTIC EXPLORATION APPLICABLE TO THE UNITED STATES PRIVATE AND PUBLIC SECTOR SPACE NEEDS. THE PURPOSE OF THE ADVANCED ELECTRIC PROPULSION (EP) SYSTEM (AEPS) CONTRACT IS THE DEVELOPMENT AND DELIVERY OF EP STRING SETS TO SUPPORT AN ADVANCED SEP DEMONSTRATION MISSION. DURING THE CONTRACT BASE PERIOD OF PERFORMANCE, THE CONTRACTOR WILL DEVELOP, TEST, AND DELIVER ENGINEERING DEVELOPMENT END ITEMS THAT WILL REDUCE THE RISK OF DEVELOPING THE FLIGHT END ITEMS. DURING THE OPTION PERIOD OF PERFORMANCE, IF EXERCISED, THE CONTRACTOR WILL DEVELOP, VERIFY, AND DELIVER THE FLIGHT END ITEMS. | aerospace |
| 2026-07-02 | RSI-QUANTITECH JV LLC | National Aeronautics and Space Administration | $225,910,543 | MARSHALL ENGINEERING TECHNICIANS AND TRADES SUPPORT (METTS III) COVERS A WIDE RANGE OF ENGINEERING TECHNICIANS AND TRADE SKILLS TO PERFORM TESTING GROUND AND SPACE BASED RESEARCH TEST OPERATIONS DATA ANALYSIS INSTRUMENTATION CALIBRATION | aerospace |
| 2026-06-24 | CACI, INC. - FEDERAL | National Aeronautics and Space Administration | $224,620,520 | NASA CONSOLIDATED APPLICATION AND PLATFORM SERVICES (NCAPS) | aerospace |
| 2026-06-25 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $223,522,338 | ADVANCED MULTI-MISSION OPERATING SYSTEM (AMMOS) (93-107877) | aerospace |
| 2026-06-24 | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | $220,359,527 | MULTI-SLIT SOLAR EXPLORER (MUSE) MISSION PHASE A | aerospace |
| 2026-06-15 | OPR LLC | National Aeronautics and Space Administration | $211,394,175 | FLIGHT DYNAMICS SUPPORT SERVICES III (FDSS). THIS CONTRACT IS FOR, BUT NOT LIMITED TO SOFTWARE ENGINEERING SUPPORT, FLIGHT DYNAMICS FACILITY OPERATIONS SUPPORT, FLIGHT DYNAMICS SYSTEMS ENGINEERING SUPPORT&CONJUNCTION ASSESSMENTS. | aerospace |
| 2026-03-05 | GENERAL ELECTRIC COMPANY | National Aeronautics and Space Administration | $211,063,273 | THE REQUIREMENT IS TO ASSIST NASA IN ACCELERATING THE INTRODUCTION OF MEGAWATT CLASS EAP SYSTEMS INTO FUTURE AIRCRAFT PRODUCTS BY U.S. INDUSTRY. THIS EFFORT HELPS TO IDENTIFY CERTIFICATION GAPS, AND ADDRESS GAPS THROUGH GROUND TEST AND FLIGHT TESTS. | aerospace |
| 2026-06-25 | TELEDYNE BROWN ENGINEERING, INC. | National Aeronautics and Space Administration | $207,936,024 | IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER | aerospace |
| 2026-06-30 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $207,319,758 | MARS RECONNAISSANCE ORBITER: PHASE E 62-10131 | aerospace |
| 2026-07-01 | RAYTHEON COMPANY | National Aeronautics and Space Administration | $200,000,000 | PROVIDE THREE LANDIS FLIGHT INSTRUMENT UNITS AND RELATED SERVICES, INCLUDING THE DESIGN, ENGINEERING ANALYSES, DEVELOPMENT, FABRICATION, INTEGRATION, ALGORITHM DEVELOPMENT, TEST, EVALUATION, DELIVERY, AND SUPPORT FOR THE LANDIS | aerospace |
| 2026-06-25 | REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | National Aeronautics and Space Administration | $199,537,577 | TIME HISTORY OF EVENTS&MACROSCALE INTERACTIONS DURING SUBSTORMS (THEMIS) MISSION PHASE A EFFORT THE CONTRACTOR SHALL PROVIDE A CONCEPT STUDY FOR THE THEMIS MISSION IN ORDER TO PROVIDE NASA WITH MORE DEFINITIVE INFORMATION REGARDING THE COST, RISK, AND FEASIBILITY OF THE INVESTIGATION. THE CONTRACTOR SHALL PREPARE AND DELIVER A CONCEPT STUDY REPORT DETAILING THE RESULTS OF THE STUDY IN ACCORDANCE WITH ATTACHMENT B OF THE CONTRACT ENTITLED "MEDIUM-CLASS EXPLORER PROGRAM GUIDELINES AND CRITERIA FOR THE PHASE A CONCEPT STUDY". THE CONTRACTOR SHALL ALSO SUPPORT A NASA SITE VISIT AT ITS FACILITY TO DISCUSS THE CONCEPT STUDY REPORT AND ATTEND A PHASE A CONCEPT STUDY REVIEW MEETING, BRIDGE PHASE OPTION: THE CONTRACTOR SHALL COMMENCE INITIAL DEFINITION PHASE ACTIVITIES, INCLUDING LONG LEAD PARTS PROCUREMENTS. AND THE FOLLOWING ACTIVITIES: - PROVIDE PROGRAM MANAGEMENT FOR THEMIS - BEGIN SCIENTIFIC STUDIES AND SIMULATIONS TO PROVIDE SCIENTIFIC INPUT FOR INSTRUMENT AND ORBIT DESIGN ENSURING THEY MEET SCIENCE GOALS - BEGIN THE DESIGN AND DEVELOPMENT AND INSTRUMENTS, OTHER HARDWARE, AND ELECTRONICS AND - BEGIN FLIGHT SOFTWARE DEVELOPMENT | aerospace |
| 2026-06-01 | S P KOROLEV ROCKET AND SPACE PUBLIC CORPORATION ENERGIA | National Aeronautics and Space Administration | $197,821,846 | ENERGIA WILL PROVIDE HARDWARE AND SERVICES THAT SUPPORT INTERNATIONAL SPACE STATION | aerospace |
| 2026-06-23 | LOCKHEED MARTIN CORPORATION | National Aeronautics and Space Administration | $193,275,152 | INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED. | aerospace |
| 2026-05-01 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $193,202,732 | MARS PROGRAM MANAGEMENT AND FUTURE PLANNING 60-8583 | aerospace |
| 2026-04-29 | AMENTUM TECHNOLOGY, INC. | National Aeronautics and Space Administration | $184,324,683 | IGF::CT::IGF THIS "TASK ORDER" HAS BEEN CREATED IN THE CONTRACT MANAGEMENT MODULE (CMM) SYSTEM FOR FUNDING PURPOSES ONLY AND IS NOT AN ACTUAL TASK ORDER WITH A STATEMENT OF WORK AND OTHER TASK ORDER REQUIREMENTS. THIS "TASK ORDER" HAS BEEN CREATED FOR FUNDING OBLIGATIONS ONLY AND TO ACCOUNT FOR CMM AND SAP FINANCIAL SYSTEM FUNCTIONALITY. THIS "TASK ORDER" IS TO FUND NNL13AA14C CLIN 402 (FFP IDIQ). CENTER MAINTENANCE, OPERATIONS, AND ENGINEERING (CMOE) CONTRACT. REQUIREMENT FOR THE MAINTENANCE, OPERATIONS, AND ENGINEERING OF LARC'S INSTITUTIONAL FACILITIES AND HIGHLY TECHNICAL RESEARCH FACILITIES FOR MISSION SUCCESS. THE CMOE CONTRACT WILL PROVIDE CORE SUPPORT SERVICES TO LARC IN THE AREAS OF INSTITUTIONAL AND RESEARCH OPERATIONS, MAINTENANCE, AND ENGINEERING (OME). THESE TECHNICAL SERVICES INCLUDE: RESEARCH FACILITIES OPERATIONS (E.G., HIGHLY SPECIALIZED WIND TUNNELS, LABORATORIES, TEST STANDS, INSTRUMENTATION CALIBRATION/REPAIR); CENTRAL UTILITIES OPERATIONS (E.G., STEAM, COMPRESSED AIR, ELECTRICAL POWER DISTRIBUTION, POTABLE WATER); TECHNOLOGY DEVELOPMENT/ADMINISTRATION (E.G., FACILITY AUTOMATION SYSTEMS [FAS], DATA ACQUISITION SYSTEMS [DAS]); RESEARCH AND INSTITUTIONAL FACILITY MAINTENANCE (E.G., PREVENTIVE MAINTENANCE, TROUBLE CALLS, RELIABILITY CENTERED MAINTENANCE [RCM], FACILITY CONDITION ASSESSMENT [FCA]); AND FACILITY ENGINEERING (E.G., DESIGN, CONSTRUCTION, CONFIGURATION MANAGEMENT, TACTICAL ENGINEERING, PRESSURE SYSTEM RECERTIFICATION, PROJECT MANAGEMENT/PLANNING SUPPORT). | aerospace |
| 2026-05-06 | THE UNIVERSITY OF IOWA | National Aeronautics and Space Administration | $183,696,367 | THE TANDEM RECONNECTION AND CUSP ELECTRODYNAMICS RECONNAISSANCE SATELLITE (TRACERS) IS PROPOSED BY THE CONTRACTOR IN RESPONSE TO THE NATIONAL AERONAUTIC AND SPACE ADMINSTRATION'S (NASA) 2016 HELIOPHYSICS SMALL EXPLORER (SMEX) ANNOUNCEMENT OF OPPORTUNITY (AO). THIS STATEMENT OF WORK (SOW) DESCRIBES THE WORK TO BE CONDUCTED BY THE CONTRACTOR DURING THE PHASE A (TRACERS) PROJECT. THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES TO PRODUCE THE TRACERS PHASE A CONCEPT STUDY REPORT (CSR) THAT ENCOMPASSES: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE (PIPO). 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE. 3. DESIGN OF A FLIGHT QUALIFIED TRACERS INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS. 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE TRACERS INSTRUMENT FLIGHT SYSTEM. 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS. 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS, FLIGHT OPERATIONS. 7. DEVELOP PLANS FOR AND LEAD THE TRACERS SCIENCE INVESTIGATION, AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS. THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE TRACERS SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING THE CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND LINES OF AUTHORITY. PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR PIPO AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A TRACERS INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A TRACERS MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR SHALL DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR SHALL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR SHALL LEAD THE SCIENCE TEAM. THE CONTRACTOR SHALL DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES AND INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR SHALL PREPARE UPDATED INSTRUMENT BUDGETS AND REVIEW AND APPROVE THE OVERALL TRACERS BUDGET. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT. | aerospace |
| 2026-04-01 | THE LELAND STANFORD JUNIOR UNIVERSITY | National Aeronautics and Space Administration | $181,839,613 | SOLAR DYNAMICS OBSERVATORY PROJECT HELIOSEISMIC AND MAGNETIC IMAGER INVESTIGATION (HMI) PHASE B/C/D/E THE CONTRACTOR SHALL PROVIDE PERSONNEL, MATERIALS, EQUIPMENT, FACILITIES AND RESOURCES NECESSARY FOR DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TESTING, CALIBRATION, QUALIFICATION AND DELIVERY OF A FLIGHT INSTRUMENT FOR SPACECRAFT INTEGRATION. DURING SPACECRAFT INTEGRATION ACTIVITIES, THE CONTRACTOR SHALL SUPPORT INSTRUMENT INSTALLATION AND INTEGRATION, INTEGRATED SPACECRAFT TESTING AND FLIGHT QUALIFICATION, LAUNCH PROCESSING AND LAUNCH. FOLLOWING LAUNCH, THE CONTRACTOR SHALL PROVIDE THE NECESSARY ENGINEERING AND SCIENCE RESOURCES TO PERFORM INITIAL ON-ORBIT CHECKOUT AND CHARACTERIZATION OF THE INSTRUMENT AND SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE PRINCIPAL HARDWARE DELIVERABLES OF THIS EFFORT ARE THE FLIGHT HARDWARE AND SOFTWARE CONSTITUTING THE FLIGHT INSTRUMENT PACKAGE AND THE NECESSARY SCIENCE PROCESSING AND SCIENCE OPERATIONS GROUND SYSTEMS AND SOFTWARE REQUIRED TO ANALYZE, PROCESS, DISTRIBUTE AND ARCHIVE THE SCIENCE MEASUREMENTS PERFORMED BY THE INSTRUMENT. | aerospace |
| 2026-05-12 | ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | National Aeronautics and Space Administration | $178,975,557 | THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC) | aerospace |
| 2026-04-17 | THE AEROSPACE CORPORATION | National Aeronautics and Space Administration | $170,343,232 | NASA-WIDE SPECIALIZED ENGINEERING, EVALUATION AND TEST SERVICES (NSEETS) TO PROVIDE ON/OFF-SITE PROJECT INDEPENDENT MULTIDISCIPLINARY ENGINEERING SERVICES, TESTING, CONSULTING, CONTRACTOR-ON-SITE MONITORING, AND EVALUATION OF PROJECT AND/OR PROGRAMS. | aerospace |
| 2026-04-30 | SOUTHWEST RESEARCH INSTITUTE | National Aeronautics and Space Administration | $168,112,735 | NEW HORIZON -- PLUTO MISSION PHASE B | aerospace |
| 2026-04-17 | PERATON INC. | National Aeronautics and Space Administration | $163,493,095 | OPERATIONS AND MANAGEMENT OF THE NASA BALLOON FACILITY | aerospace |
| 2026-04-03 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $160,734,496 | EXOPLANET EXPLORATION ION PROGRAM (EXEP) SCIENCE&RESEARCH TECHNOLOGY (ST&T) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TECHNOLOGY INSERTION, AND MANAGEMENT OF NASA S DEEP SPACE NETWORK TO PROVIDE TELECOMMUNICATION AND OPERATION SERVICES, INCLUDING DATA ACQUISITION AND DATA DELIVERY REQUIRED TO MEET ESTABLISHED AGENCY OBJECTIVES. 8) JPL IS ALSO REQUIRED TO MAINTAIN AND CONDUCT AN EDUCATION PROGRAM IN CLOSE COORDINATION WITH THE NASA HEADQUARTERS EDUCATION OFFICE, THE ACADEMIC COMMUNITY AT LARGE, AND IN SUPPORT TO NASA STRATEGIC OBJECTIVES TO IMPROVE STUDENT RETENTION IN THE SCIENCE, TECHNOLOGY, ENGINEERING, AND MATHEMATICS (STEM) DISCIPLINES. WORK FOR NON-NASA SPONSORS: JPL MAY PERFORM WORK FOR NON-NASA SPONSORS. THIS WORK WILL BE DESIGNATED IN TASK ORDERS ISSUED BY NMO CONTRACTING OFFICERS BASED ON TASK PLANS INITIATED BY THE CONTRACTOR. | aerospace |
| 2026-05-13 | ASRC FEDERAL FACILITIES LOGISTICS LLC | National Aeronautics and Space Administration | $158,959,541 | THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE REPAIRS, OPERATIONS & MAINTENANCE, AND ENGINEERING (ROME) AND RELATED SERVICES FOR THE GODDARD SPACE FLIGHT CENTER (GREENBELT AND WALLOPS FLIGHT FACILITY). | aerospace |
| 2026-03-14 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $155,472,798 | INCUS (INVESTIGATION OF CONVECTIVE UPDRAFTS) (89-111155) | aerospace |
| 2026-05-12 | CGI FEDERAL INC. | National Aeronautics and Space Administration | $152,510,860 | PROGRAM SUPPORT SERVICES (CPSS) PROGRAMMATIC SUBJECT MATTER EXPERT (SME) IDIQ TASK ORDER FOR MARSHALL SPACE FLIGHT CENTER (MSFC). | aerospace |
| 2026-05-14 | PERATON INC. | National Aeronautics and Space Administration | $150,212,174 | NSROC IV CONTRACTOR SHALL DESIGN, FABRICATE, INTEGRATE, & PERFORM FLIGHT QUALIFICATION TESTING OF SUB-ORBITAL PAYLOADS, PROVIDE LAUNCH VEHICLES & ASSOCIATED HARDWARE, & PROVIDE VARIOUS ACTIVITIES ASSOCIATED WITH SUBSEQUENT MISSION LAUNCH OPERATIONS | aerospace |
| 2026-04-03 | ASTRION GROUP, LLC | National Aeronautics and Space Administration | $148,510,420 | LABORATORY SUPPORT SERVICES AND OPERATIONS II (LASSO) II CONTRACT | aerospace |
| 2026-03-17 | COMMONWEALTH SCIENTIFIC AND INDUSTRIAL RESEARCH ORGANISATION | National Aeronautics and Space Administration | $147,923,745 | DSN OPERATION AND MAINTENANCE CDSCC | aerospace |