The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$61,761,618

Department of the Interior·Bureau of Reclamation

to AMES FEDERAL CONTRACTING GROUP LLC

energyactive
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R4026C0001_1425_-NONE-_-NONE-
Award description

NGWSP PUMPING PLANT 1

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Construction or operation of a pumping plant for the North Gunnison Water Sharing Project.

Sub-sectors
water-infrastructurehydroelectric-power
Why this matters

Critical water infrastructure supporting agricultural irrigation and hydroelectric generation in the Colorado River Basin.

Supply-chain signal

Demand for heavy industrial pumping equipment, electrical systems, and construction materials from specialized manufacturers.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-14. Cost: $0.001106.

Period of performance
Start
2025-11-10
End
2028-05-28
Status
activein 745 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.