The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$113,382,358

Department of the Interior·Bureau of Reclamation

to AMES FEDERAL CONTRACTING GROUP LLC

energyactive
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R4025C0005_1425_-NONE-_-NONE-
Award description

THE WORK ASSOCIATED WITH THE HYRUM DAM SPILLWAY REPLACEMENT PROJECT WILL TAKE PLACE APPROXIMATELY 9 MILES SOUTHWEST OF LOGAN, UTAH IN CACHE COUNTY, UTAH. THE OVERALL WORK IS FOR THE CONSTRUCTION OF A NEW SPILLWAY AND THE REMOVAL OF THE EXISTING SPILL

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Construction of a new spillway and removal of existing spillway at Hyrum Dam in Utah.

Sub-sectors
water-infrastructuredam-operations
Why this matters

Critical water infrastructure maintenance ensures dam safety, flood control, and water resource management for regional communities.

Supply-chain signal

Demand for heavy construction equipment, concrete, engineering services, and specialized dam construction contractors.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-14. Cost: $0.001175.

Period of performance
Start
2025-03-21
End
2029-02-10
Status
activein 1003 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.