The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$57,981,195

Department of Transportation·Federal Highway Administration

to ILLINOIS DEPARTMENT OF TRANSPORTATION

WORK BEGAN·LATEST ACTION2026-04-02·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000Y001ILI4WJ714_069
Award description

PROJECT TITLE: PAVEMENT RECONSTRUCTION AND CULVERT REPLACEMENT ON I-80 FROM RIDGE RD TO RIVER RD :::: PROJECT DESCRIPTION: PAVEMENT RECONSTRUCTION AND CULVERT REPLACEMENT ON I-80 FROM RIDGE RD TO RIVER RD

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds pavement reconstruction and culvert replacement on I-80 between Ridge Road and River Road in Illinois.

Sub-sectors
highway-infrastructurepavement-reconstructionfhwa-formula-grant
Why this matters

Maintains a major transcontinental corridor critical to Midwest freight and commerce.

Supply-chain signal

Drives demand for construction materials including asphalt, concrete, and steel from regional suppliers.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-08. Cost: $0.014949.

Period of performance
Start
End
2030-04-27
Status
activein 1384 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$58.0M Department of Transportation — The Buildout — The Buildout