$83,885,825
to ILLINOIS DEPARTMENT OF TRANSPORTATION
PROJECT TITLE: ROADWAY RECONSTRUCTION AND BRIDGE REHABILITATION ON I-64 FROM WASHINGTON COUNTY LINE TO I-57 :::: PROJECT DESCRIPTION: ROADWAY RECONSTRUCTION AND BRIDGE REHABILITATION ON I-64 FROM WASHINGTON COUNTY LINE TO I-57
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds roadway reconstruction and bridge rehabilitation on Interstate 64 in Illinois between Washington County and I-57.
Critical infrastructure maintenance on a major interstate corridor supporting regional commerce and mobility.
Drives demand for construction materials, heavy equipment, engineering services, and asphalt/concrete suppliers in the Illinois region.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002042.
- 2026-04-17PROJECT TITLE: INTERCHANGE RECONSTRUCTION AND BRIDGE REPLACEMENT RECONSTRUCTION ON I-57 AT I-74 INTERCHANGE :::: PROJECT DESCRIPTION: INTERCHANGE RECONSTRUCTION AND BRIDGE REPLACEMENT RECONSTRUCTION ON I-57 AT I-74 INTERCHANGE$99.0M
- 2026-04-02PROJECT TITLE: BRIDGE REPLACEMENT AND INTERCHANGE RECONSTRUCTION ON I-80 AT CENTER STREET IN JOLIET. :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT AND INTERCHANGE RECONSTRUCTION ON I-80 AT CENTER STREET IN JOLIET.$59.1M
- 2026-04-02PROJECT TITLE: PAVEMENT RECONSTRUCTION AND CULVERT REPLACEMENT ON I-80 FROM RIDGE RD TO RIVER RD :::: PROJECT DESCRIPTION: PAVEMENT RECONSTRUCTION AND CULVERT REPLACEMENT ON I-80 FROM RIDGE RD TO RIVER RD$58.0M
- —PROJECT TITLE: DESIGNED OVERLAY AND BRIDGE AND RAMP REPAIR ON I-255 FROM 0.2 MI N OF IL 157 TO IL 15 IN CAHOKIA HEIGHTS :::: PROJECT DESCRIPTION: DESIGNED OVERLAY AND BRIDGE AND RAMP REPAIR ON I-255 FROM 0.2 MI N OF IL 157 TO IL 15 IN CAHOKIA HEIGHTS$47.3M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22330000Y001ILSQHC418_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.