The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/GRANT

$142,800,000

Department of Transportation·Federal Railroad Administration

to DEPARTMENT OF TRANSPORTATION CONNECTICUT

WORK BEGAN2026-03-01·LATEST ACTION2026-04-13·SOURCEUSASPENDING·SOURCE IDASST_NON_69A36526420940FSPCT_069
Award description

THE PROJECT INCLUDES PRELIMINARY ENGINEERING, NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REVIEW, AND FINAL DESIGN FOR PHASE 2 AND PHASE 3, AND CONSTRUCTION OF PHASE 1, PHASE 2, AND PHASE 3 (REFERRED TO INDIVIDUALLY AS A PHASE OR COLLECTIVELY AS PHASES ). FOR PHASE 1, THE RECIPIENT WILL COMPLETE ENVIRONMENTAL DOCUMENTATION AND PRELIMINARY ENGINEERING FOR FRA REVIEW AND APPROVAL AND FINAL DESIGN FOR FRA ACCEPTANCE WITH FUNDING OUTSIDE OF THIS GRANT. THE RECIPIENT WILL PREPARE ENVIRONMENTAL DOCUMENTATION, PRELIMINARY ENGINEERING, AND FINAL DESIGN FOR PHASES 2 AND 3, AND COMPLETE CONSTRUCTION OF ALL THREE PHASES, WITH FUNDS ADMINISTERED THROUGH THIS AGREEMENT.CONSTRUCTION INCLUDES THE REPLACEMENT OF SEVEN AGING SUBSTATIONS AND ASSOCIATED POWER EQUIPMENT THAT HAVE REACHED THE END OF THEIR USEFUL LIVES. THESE SUBSTATIONS AND THEIR COMPONENTS, ORIGINALLY CONSTRUCTED IN 1970S AND PARTIALLY UPGRADED IN THE 1980S, ARE THE FREQUENT CAUSE OF INFRASTRUCTURE FAILURES AND SERVICE DISRUPTIONS. REPLACEMENT OF THESE ANTIQUATED POWER INFRASTRUCTURE ASSETS IS ESSENTIAL TO MAINTAINING A STATE-OF-GOOD-REPAIR AND ENSURING RELIABLE TRAIN SERVICE FOR THE NEW HAVEN LINES 23 MILLION ANNUAL PASSENGERS.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Replace seven aging electrical substations on Connecticut's New Haven rail line to restore reliable service for 23 million annual passengers.

Sub-sectors
rail-infrastructurepower-systemsnortheast-corridor
Why this matters

Aging 1970s power infrastructure causes frequent service disruptions on a major Northeast Corridor commuter line; replacement ensures state-of-good-repair and regional transit reliability.

Supply-chain signal

Demand for electrical substation equipment, transformers, and power distribution components; likely benefits industrial electrical manufacturers and grid modernization suppliers.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-24. Cost: $0.003042.

Period of performance
Start
2026-03-01
End
2032-07-31
Status
activein 2210 days
Other awards from this recipient
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$142.8M Department of Transportation — The Buildout — The Buildout