Awards/PROJECT GRANT (B)

$172,000,000

Department of Transportation·Federal Railroad Administration

to DEPARTMENT OF TRANSPORTATION CONNECTICUT

ACTION DATE2026-03-02·SOURCEUSASPENDING·SOURCE IDASST_NON_69A36526421300FSPCT_069
Award description

THE TIME-1 PROJECT IN ITS TOTALITY WILL BE LET FOR CONSTRUCTION IN THREE PHASES (CONTRACT A, CONTRACT B, AND CONTRACT C). THIS PROJECT FUNDS ONLY A PORTION OF THE FIRST CONSTRUCTION CONTRACT PACKAGE (CONTRACT A) FOR THE TIME-1 PROJECT. THIS PROJECT WILL FUND THE CONSTRUCTION OF APPROXIMATELY 141 CATENARY POLE FOUNDATIONS. THIS PROJECT WILL FUND THE CONSTRUCTION OF THE ADDITION OF THREE (3) NEW CROSS-OVERS TO CP-257 THE REPLACEMENT OF THE LONGBROOK AVENUE BRIDGE AND INSTALLATION OF APPROXIMATELY EIGHTY-EIGHT (88) CATENARY STRUCTURES INCLUDING APPROXIMATELY FORTY-ONE (41) CATENARY POLE FOUNDATIONS. THE REMAINING SCOPE ELEMENTS OF CONTRACT A FOR THE TIME-1 PROJECT WILL BE FUNDED BY THE FISCAL YEAR (FY) 2023 CONGRESSIONALLY DIRECTED CONSOLIDATED RAIL INFRASTRUCTURE AND SAFETY IMPROVEMENTS PROGRAM GRANT.THE PROJECT WILL EXPEDITE TRAVEL FOR INTERCITY AND COMMUTER RAIL PASSENGERS AND FREIGHT OPERATIONS BY ENHANCING TRACK, STATION, BRIDGE, AND OTHER CRITICAL INFRASTRUCTURE. THESE IMPROVEMENTS WILL REDUCE TRACK OUTAGES, CAUSE FEWER DELAYS DURING CONSTRUCTION PERIODS, AND IMPROVE OPERATING FLEXIBILITY AND RELIABILITY. PUBLIC SAFETY WILL ALSO BE IMPROVED THROUGH TWO MAIN PATHWAYS: INCREASING THE HEIGHT OF VERTICAL CLEARANCE BRIDGES WILL REDUCE VEHICULAR BRIDGE STRIKES AND RAISING THE TRACK TO A HIGHER INSPECTION AND MAINTENANCE STANDARD REQUIRED OF CLASS 6 TRACK WILL REDUCE THE LIKELIHOOD OF INFRASTRUCTURE FAILURE.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds construction of catenary infrastructure, bridges, and track improvements for Connecticut's TIME-1 rail modernization project.

Sub-sectors
rail-infrastructureintercity-railtrack-modernization
Why this matters

Enhances intercity and commuter rail reliability, reduces delays, improves safety through bridge clearance and track standards upgrades.

Supply-chain signal

Drives demand for catenary poles, structural steel, bridge materials, and rail construction equipment from domestic suppliers.

U.S.–China competition angle

U.S. rail infrastructure modernization competes with Chinese high-speed rail expansion in global transportation markets.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002578.

Period of performance
Start
2026-01-01
End
2031-01-31
Status
activein 1721 days