$195,978,061
to TRANSPORTATION, MICHIGAN DEPARTMENT OF
PROJECT TITLE: STATEWIDE STATEWIDE :::: PROJECT DESCRIPTION: A BRIDGE BUNDLING PROGRAM MANAGER CONSULTANT PMC WILL ASSIST MDOT IN THE DEVELOPMENT AND ADMINISTRATION OF PHASE II OF THE BRIDGE BUNDLING INITIATIVE AS PART OF THE HIP-CRRSAA BRIDGE BUNDLING PROGRAM, SPECIFIC TO MICHIGAN SENATE BILL 611 INCLUDED IN THE STATE BUDGET AND SIGNED INTO LAW BY THE GOVERNOR. PHASE II OF THE BRIDGE BUNDLING INITIATIVE SPECIFICALLY PRIORITIZES LOCALLY OWNED VEHICULAR BRIDGES CURRENTLY CLOSED TO TRAFFIC, LOCALLY OWNED VEHICULAR BRIDGES CURRENTLY POSTED OR RESTRICTED FROM MICHIGAN LEGAL LOADS, OR LOCALLY OWNED VEHICULAR BRIDGES IN NEED OF REHABILITATION OR REPLACEMENT AS RATED BY REGIONAL BRIDGE COUNCILS TO ENSURE CITIZEN SAFETY OR UNIMPEDED COMMERCIAL TRAFFIC. THIS PHASE OF THE INITIATIVE WILL FOCUS ON REHABILITATION OR REPLACEMENT OF ON AND OFF SYSTEM LOCALLY OWNED BRIDGES THAT MEET THE PRIORITIES IDENTIFIED IN THE BILL. ;STATEWIDE; ,
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Funds Michigan's Phase II bridge bundling program to rehabilitate or replace locally owned bridges that are closed, restricted, or unsafe.
Addresses critical infrastructure deficiencies in local bridge networks to restore commercial traffic flow and public safety across Michigan.
Will drive demand for bridge construction materials, engineering services, and construction contractors in Michigan's regional markets.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002283.
- 2026-04-02I-94 W M-60 TO SARGENT ROAD$74.7M
- —PROJECT TITLE: US-23 SCHOOL ROAD TO IDA CENTER ROAD :::: PROJECT DESCRIPTION: ROAD RECONSTRUCTION - SINGLE COURSE MILL AND HMA OVERLAY FOR RAMPS AND WELCOME CENTER US-23 SCHOOL ROAD TO IDA CENTER ROAD$50.8M
- —PROJECT TITLE: I-94 E WEST OF HELMER ROAD TO M-311 IN CALHOUN COUNTY :::: PROJECT DESCRIPTION: MILLING AND TWO COURSE ASPHALT RESURFACING, BRIDGE REPLACEMENT, TEMPORARY WIDENING, BRIDGE RAILING REPAIR AND INTERCHANGE REHABILITATION. I-94 FROM APPROXIMATELY 3200' WEST OF HELMER ROAD TO M-311 IN CALHOUN COUNTY$36.7M
- —PROJECT TITLE: US-23 STONY CREEK TO ELLSWORTH :::: PROJECT DESCRIPTION: MILLING AND TWO-COURSE OVERLAY US-23 FROM STONY CREEK TO ELLSWORTH$34.8M
- —PROJECT TITLE: MICHIGAN URBAN BRIDGES REVITALIZATION :::: PROJECT DESCRIPTION: COMPETITIVE GRANT PROJECT: SUPERSTRUCTURE BRIDGE REPLACEMENT AS PART OF THE PHASE 3 BRIDGE BUNDLING PROGRAM. SN 678 AT FRASER ST OVER THE KAWKAWLIN RIVER; SN 3936 AT E ELM ST OVER RED CEDAR RIVER; SN 8144 AT SASHABAW RD OVER CLINTON RIVER; SN 8941AT W SPRING LAKE RD OVER SMITH BAYOU; SN 10982 AT PLYMOUTH RD OVER FLEMMING CREEK; SN 12107 AT BECK RD OVER JOHNSON DRAIN; SN 12498 AT HARRISON ST OVER E BR ECORSE RIVER$34.2M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22230000Z970MI22A0159_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.