$50,847,523
Department of Transportation·Federal Highway Administration
to TRANSPORTATION, MICHIGAN DEPARTMENT OF
transportationactive
WORK BEGAN2025-11-10·LATEST ACTION—·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22630000Y001MI26A0029_069
Award description
PROJECT TITLE: US-23 SCHOOL ROAD TO IDA CENTER ROAD :::: PROJECT DESCRIPTION: ROAD RECONSTRUCTION - SINGLE COURSE MILL AND HMA OVERLAY FOR RAMPS AND WELCOME CENTER US-23 SCHOOL ROAD TO IDA CENTER ROAD
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Road reconstruction and resurfacing on US Highway 23 in Michigan with asphalt overlay.
Sub-sectors
highway-reconstructionfhwa-formula-grantasphalt-overlay
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-10. Cost: $0.008764.
Period of performance
Start
2025-11-10
End
2034-11-15
Status
activein 3047 days
Other awards from this recipient
- 2026-03-03PROJECT TITLE: STATEWIDE STATEWIDE :::: PROJECT DESCRIPTION: A BRIDGE BUNDLING PROGRAM MANAGER CONSULTANT PMC WILL ASSIST MDOT IN THE DEVELOPMENT AND ADMINISTRATION OF PHASE II OF THE BRIDGE BUNDLING INITIATIVE AS PART OF THE HIP-CRRSAA BRIDGE BUNDLING PROGRAM, SPECIFIC TO MICHIGAN SENATE BILL 611 INCLUDED IN THE STATE BUDGET AND SIGNED INTO LAW BY THE GOVERNOR. PHASE II OF THE BRIDGE BUNDLING INITIATIVE SPECIFICALLY PRIORITIZES LOCALLY OWNED VEHICULAR BRIDGES CURRENTLY CLOSED TO TRAFFIC, LOCALLY OWNED VEHICULAR BRIDGES CURRENTLY POSTED OR RESTRICTED FROM MICHIGAN LEGAL LOADS, OR LOCALLY OWNED VEHICULAR BRIDGES IN NEED OF REHABILITATION OR REPLACEMENT AS RATED BY REGIONAL BRIDGE COUNCILS TO ENSURE CITIZEN SAFETY OR UNIMPEDED COMMERCIAL TRAFFIC. THIS PHASE OF THE INITIATIVE WILL FOCUS ON REHABILITATION OR REPLACEMENT OF ON AND OFF SYSTEM LOCALLY OWNED BRIDGES THAT MEET THE PRIORITIES IDENTIFIED IN THE BILL. ;STATEWIDE; ,$196.0M
- 2026-04-02I-94 W M-60 TO SARGENT ROAD$74.7M
- 2026-05-19PROJECT TITLE: M-102 E M-1 (WOODWARD AVENUE) TO M-53 (VAN DYKE AVENUE) :::: PROJECT DESCRIPTION: MILLING AND TWO COURSE ASPHALT RESURFACING M-1 (WOODWARD AVENUE) TO M-53 (VAN DYKE AVENUE) AND WB M-102 AT HUBBELL INTERSECTION$39.5M
- —PROJECT TITLE: I-94 E WEST OF HELMER ROAD TO M-311 IN CALHOUN COUNTY :::: PROJECT DESCRIPTION: MILLING AND TWO COURSE ASPHALT RESURFACING, BRIDGE REPLACEMENT, TEMPORARY WIDENING, BRIDGE RAILING REPAIR AND INTERCHANGE REHABILITATION. I-94 FROM APPROXIMATELY 3200' WEST OF HELMER ROAD TO M-311 IN CALHOUN COUNTY$36.7M
- —PROJECT TITLE: US-23 STONY CREEK TO ELLSWORTH :::: PROJECT DESCRIPTION: MILLING AND TWO-COURSE OVERLAY US-23 FROM STONY CREEK TO ELLSWORTH$34.8M
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_693JJ22630000Y001MI26A0029_069.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.