The BuildoutBeta

$40,779,987

Department of Veterans Affairs·Department of Veterans Affairs

to RICHARD GROUP LLC

veteransexpiredONGOING · MOD OF 2023 CONTRACT
WORK BEGAN2023-07-01·LATEST ACTION2026-03-17·SOURCEUSASPENDING·SOURCE IDCONT_AWD_36C77623C0065_3600_-NONE-_-NONE-
Award description

CONTRACTOR SHALL COMPLETELY PREPARE SITE FOR BUILDING OPERATIONS, INCLUDING DEMOLITION AND REMOVAL OF EXISTING STRUCTURES, AND FURNISH LABOR AND MATERIALS AND PERFORM WORK FOR THE EHRM INFRASTRUCTURE UPGRADES MADISON PROJECT.

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Modification to the VA Madison facility upgrade contract begun in 2023 for site demolition and infrastructure preparation.

Sub-sectors
facility-upgradessite-demolitioninfrastructure-modernization
Why this matters

This modification to the Madison project reflects the VA's ongoing investment in facility infrastructure to support veteran healthcare delivery.

Supply-chain signal

Demolition and site preparation work drives demand for heavy equipment, demolition contractors, and skilled construction labor.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-13. Cost: $0.015893.

Period of performance
Start
2023-07-01
End
2025-10-17
Status
expired269 days ago
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$40.8M Department of Veterans Affairs — The Buildout — The Buildout