The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$75,835,423

Department of Veterans Affairs·Department of Veterans Affairs

to RICHARD GROUP LLC

veteransactiveONGOING · MOD OF 2023 CONTRACT
WORK BEGAN2023-10-16·LATEST ACTION2026-03-11·SOURCEUSASPENDING·SOURCE IDCONT_AWD_36C77623C0113_3600_-NONE-_-NONE-
Award description

THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRA. UPG. HINES IL CONSTRUCTION PROJECT CONSISTENT WITH SPECS AND DRAWINGS

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Infrastructure upgrade and construction at VA medical facility in Hines, Illinois under an ongoing 2023 contract.

Sub-sectors
va-infrastructureconstructionmedical-facility
Why this matters

VA facility modernization improves veteran healthcare delivery capacity and working conditions for clinical staff.

Supply-chain signal

Ongoing construction project signals sustained demand for building materials, labor, and equipment suppliers supporting VA infrastructure modernization.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-01. Cost: $0.002712.

Period of performance
Start
2023-10-16
End
2027-03-09
Status
activein 239 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$75.8M Department of Veterans Affairs — The Buildout — The Buildout