$133,496,110
CMC CONSTRUCTION SERVICES FOR THE FRANK E. MOSS SEISMIC UPGRADE, BACKFILL, AND RENOVATION PROJECT LOCATED IN SALT LAKE CITY, UTAH.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Seismic upgrade, backfill, and renovation of the Frank E. Moss federal building in Salt Lake City, Utah.
Strengthens critical federal infrastructure resilience against seismic hazards in a high-risk region.
Drives demand for construction materials, engineering services, and seismic retrofit technologies in the Mountain West.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002074.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_47PJ0021C0045_4740_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.