The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$55,802,987

Department of the Interior·Bureau of Reclamation

to GARCO CONSTRUCTION, INC.

environmentactiveONGOING · MOD OF 2023 CONTRACT
WORK BEGAN2023-09-13·LATEST ACTION2026-03-27·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R1023C0008_1425_-NONE-_-NONE-
Award description

CLE ELUM DAM FISH PASSAGE FACILITY ADULT FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Constructs an adult fish passage facility at Cle Elum Dam to restore salmon migration in Washington's Yakima River Basin.

Sub-sectors
water-infrastructurefish-passagedam-modernization
Why this matters

Addresses ESA compliance and restores anadromous fish populations critical to Pacific Northwest ecosystems and tribal treaty rights.

Supply-chain signal

Signals sustained demand for specialized hydroelectric dam engineering, fish passage technology, and heavy civil construction in water infrastructure modernization.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002084.

Period of performance
Start
2023-09-13
End
2027-06-01
Status
activein 380 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.