$88,350,971
IGF::OT::IGF CEFP INTAKE, GATE&HELIX PROJECT, YAKIMA RIVER BASIN ENHANCEMENT PROJECT, INTEGRATED YAKIMA PROJECT, WASHINGTON
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Latest obligation on the 2018 Yakima River Basin Enhancement Project in Washington, funding intake, gate, and helix construction for integrated water management.
The Integrated Yakima Project is a multi-decade effort to restore salmon habitat and balance agricultural water needs in a critical Pacific Northwest basin facing drought and climate stress.
Ongoing heavy civil construction contract signals sustained demand for concrete, steel, and specialized hydraulic engineering suppliers in the Pacific Northwest.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-30. Cost: $0.002872.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_140R1018C0025_1425_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.