$116,740,450
to WHITING-TURNER CONTRACTING COMPANY, THE
DESIGN/BUILD CONSTRUCTION FOR CHARLESTON PIER MIKE RECAPITALIZATION, USCG BASE CHARLESTON, SOUTH CAROLINA
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Design and build reconstruction of Pier Mike at USCG Base Charleston, South Carolina.
Critical infrastructure modernization for Coast Guard operations and readiness in a major southeastern port.
Whiting-Turner will source construction materials, marine engineering services, and specialized pier-construction expertise; demand signals for steel, concrete, and maritime contractors.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-05-26. Cost: $0.002669.
- 2026-07-02ACCELERATED DESIGN-BUILD TO BUDGET CONSTRUCT BARRACKS, MULTI-USE TRAINING FACILITY, GALLEY & FIREHOUSE AT USCG TRACEN CAPE MAY, CAPE MAY, NJ$400.0M
- 2026-05-22DESIGN BUILD AWARD FOR THE REIMAGINED BLS & CENSUS CONSOLIDATION AT THE GSA SUITLAND FEDERAL CENTER$199.4M
- 2026-04-23CERCLA CLEAN-UP EFFORT AND WATERFRONT RECAPITALIZATION AT BASE SEATTLE TO SUPPORT THE HOMEPORTING OF NEW USCG POLAR SECURITY CUTTERS.$137.8M
- 2026-05-12DESIGN BUILD CHARLESTON PIER PAPA RECAPITALIZATION, USCG BASE CHARLESTON, CHARLESTON SC$131.9M
- 2026-05-18CONTRACTOR TO PROVIDE BRIDGING DESIGN BUILD SERVICES FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OHIO.$98.8M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70Z04726FPCNI0005_7008_70Z04723DPCNI0006_7008.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.