$400,000,000
to WHITING-TURNER CONTRACTING COMPANY, THE
ACCELERATED DESIGN-BUILD TO BUDGET CONSTRUCT BARRACKS, MULTI-USE TRAINING FACILITY, GALLEY & FIREHOUSE AT USCG TRACEN CAPE MAY, CAPE MAY, NJ
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Construction of barracks, training facility, galley, and firehouse at U.S. Coast Guard Training Center Cape May, New Jersey.
Modernizes critical Coast Guard training infrastructure supporting personnel readiness and operational capability.
Drives demand for construction materials, labor, and building systems suppliers serving federal military projects.
Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-13. Cost: $0.001196.
- —CERCLA CLEAN-UP EFFORT AND WATERFRONT RECAPITALIZATION AT BASE SEATTLE TO SUPPORT THE HOMEPORTING OF NEW USCG POLAR SECURITY CUTTERS.$137.8M
- —CONTRACTOR TO PROVIDE BRIDGING DESIGN BUILD SERVICES FOR THE ASHLEY U.S. COURTHOUSE MODERNIZATION AND NEW ANNEX PROJECT IN TOLEDO, OHIO.$98.8M
- —CONSTRUCT AIR STATION POINT MUGU, NAVAL BASE VENTURA COUNTY (NBVC), POINT MUGU, CA$74.5M
- —RENOVATION OF BUILDING 1 WINGS 5, 4 AND PARTIAL SPINE, NIST BOULDER CO.$63.1M
- —DESIGN BUILD CHASE HALL BARRACKS ANNEX D MID-LIFE RENOVATIONS PHASE VI, AT U.S. COAST GUARD ACADEMY, NEW LONDON, CT.$34.7M
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_70Z04726FPCNI0009_7008_70Z04723DPCNI0006_7008.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.