Database / Awards
Federal awards
Every contract and grant ingested from USAspending.gov. Pick an agency to narrow the list; toggle Highest / Lowest to sort. Click any row to open the full award profile.
Sort by
Results
4,685 awards
Showing 801–850
| Action date | Recipient | Agency | Amount | Description | Sector |
|---|---|---|---|---|---|
| 2026-03-17 | UNIVERSITY OF ROCHESTER | Department of Energy | $305,343,891 | THIS PROPOSAL PRESENTS THE PLANNED PROGRAM AT THE UNIVERSITY OF ROCHESTER’S LABORATORY FOR LASER ENERGETICS (LLE) FOR THE NEXT FIVE-YEAR PERIOD (FY24–FY28) AND SUMMARIZES LLE’S ACCOMPLISHMENTS DURING THE CURRENT PERIOD (FY19–FY23). LLE’S RESEARCH ACTIVITIES FOCUS ON SUPPORTING THE MISSIONS OF THE NATIONAL NUCLEAR SECURITY ADMINISTRATION (NNSA) IN INERTIAL CONFINEMENT FUSION (ICF), HIGH-ENERGY-DENSITY (HED) PHYSICS, AND LASER AND OPTICAL SCIENCE AND TECHNOLOGY. LLE OPERATES THE OMEGA LASER FACILITY (INCLUDING THE 60-BEAM OMEGA AND THE FOUR-BEAM OMEGA EP LASER SYSTEMS) AS NNSA’S PRINCIPAL HED USER FACILITY. TOGETHER WITH THE UNIVERSITY OF ROCHESTER’S NEW HED PHYSICS CURRICULUM, LLE PROVIDES A UNIQUE, MISSION-ORIENTED EDUCATIONAL EXPERIENCE THAT PREPARES STUDENTS FOR A CAREER WITHIN THE NATIONAL SECURITY COMPLEX. BY ENHANCING THIS PIPELINE, LLE HAS SIGNIFICANTLY EXPANDED THE NUMBER OF GRADUATES ENTERING THE NNSA WORKFORCE, WHICH IS HELPING TO FILL THE NEEDS OF THE STOCKPILE STEWARDSHIP PROGRAM. | energy |
| 2026-02-20 | SAN BERNARDINO, COUNTY OF | Department of Health and Human Services | $304,236,922 | HEAD START AND EARLY HEAD START | social-services |
| 2026-03-04 | ADVANCED TECHNOLOGY INTERNATIONAL | Department of Health and Human Services | $303,999,997 | OTHER TRANSACTION: PRODUCTION OF DRUG SUBSTANCES AND DRUG PRODUCTS AT COMMERCIAL SCALE UNDER BIOMAP-CONSORTIUM | biotech |
| 2026-06-01 | CALIFORNIA INSTITUTE OF TECHNOLOGY | National Aeronautics and Space Administration | $303,779,748 | SURFACE WATER AND OCEAN TOPOGRAPHY (SWOT) 83-16443 | aerospace |
| 2026-04-24 | COOK INLET HOUSING AUTHORITY | Department of Housing and Urban Development | $303,620,502 | INDIAN HSG BLOCK GR | housing |
| 2026-05-21 | MARYLAND DEPARTMENT OF HEALTH | Department of Health and Human Services | $303,243,477 | MEDICAID ENTITLEMENT FOR 28 - FY 2026 - T19 | health |
| 2026-05-01 | MAXIMUS EDUCATION LLC | Department of Education | $303,129,964 | OPERATIONS AND MAINTENANCE (O&M) TASK ORDER FOR STUDENT LOAN SERVICING IN ACCORDANCE WITH THE REQUIREMENTS OF THE USDS CONTRACT. ALL WORK AND DELIVERABLES PROVIDED MUST BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT FOR THE TASK ORDER. | education |
| 2026-04-06 | HUMAN SERVICES, NEW JERSEY DEPARTMENT OF | Department of Health and Human Services | $302,026,131 | 2026 TANF | social-services |
| 2026-04-13 | WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY | Department of Transportation | $301,321,807 | THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA) IS APPLYING FOR $102400000 IN FFY2022 SECTION 5337 STATE OF GOOD REPAIR (SOGR) PROGRAM FUNDS APPORTIONED TO THE URBANIZED AREA (UZA). THIS REQUEST IS CONSISTENT WITH THE SUBALLOCATION OF FUNDS AS AGREED TO AMONG THE THREE RECIPIENTS WITHIN THE UZA OF THE DISTRICT OF COLUMBIA VIRGINIA AND MARYLAND. WMATAS SPLIT LETTER IS ATTACHED TO THIS APPLICATION. THIS REQUEST IS COMPRISED OF $5150378 IN HIGH INTENSITY MOTORBUS (HIMB) FUNDING AND $97249622 IN SOGR FORMULA FUNDING. THESE FUNDS REQUIRE A 20% LOCAL MATCH IN THE AMOUNT OF $25600000. THE NON-FEDERAL SHARE WILL BE PROVIDED BY THE DISTRICT OF COLUMBIA THE STATE OF MARYLAND AND PARTICIPATING JURISDICTIONS IN THE COMMONWEALTH OF VIRGINIA. WMATAS CURRENT TRANSIT ASSET MANAGEMENT (TAM) PLAN WAS ADOPTED ON OCTOBER 21 2018 AND WILL BE UPDATED IN ACCORDANCE WITH CURRENT REGULATIONS BY OCTOBER 2022. PROJECTS INCLUDED HEREIN REFLECT THE GOALS OF THE TAM PLAN. THE APPLICATIONS FUNDS THE PROJECTS AND ACTIVITIES LISTED BELOW. PURPOSE OF AWARD: THE PURPOSE OF THIS AWARD IS TO PROVIDE ROUTINE AND SCHEDULED PREVENTIVE MAINTENANCE OF METROS SYSTEM TRACK AND STRUCTURES AND METRO RAILCAR FLEET. ACTIVITIES TO BE PERFORMED: WMATA WILL CONDUCT ROUTINE AND SCHEDULED MAINTENANCE OF METROS RAILCAR FLEET AND PREVENTIVE MAINTENANCE OF TRACK ALONG THE MAINLINE AND YARDS AND REHABILITATION OF TRACK STRUCTURES. EXPECTED OUTCOME: WMATA WILL PROVIDE SAFE AND RELIABLE RAIL TRANSIT SYSTEM FOR ITS CUSTOMERS AND WMATA EMPLOYEES AND PROVIDE MODERN OPERATIONAL FACILITIES FOR MAINTAINING ASSETS AND RAIL OPERATIONS AND ENSURE A STATE OF GOOD REPAIR OF ITS ASSETS. INTENDED BENEFICIARIES: WMATAS BENEFICIARIES ARE WMATA EMPLOYEES AND WMATA CUSTOMERS WHO COMMUTE WITHIN OR CONNECT TO PUBLIC TRANSIT WITHIN THE DISTRICT OF COLUMBIA VIRGINIA AND MARYLAND REGION. SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS ASSOCIATED WITH THIS AWARD. | transportation |
| 2026-05-27 | LOCKHEED MARTIN CORP | National Aeronautics and Space Administration | $300,982,194 | RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUATION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAVEN PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM, WHICH CONSISTS OF THE INTEGRATED SPACECRAFT AND SCIENCE PAYLOADS IN ACCORDANCE WITH THE STATEMENT OF WORK. | aerospace |
| 2026-05-29 | ORACLE HEALTH GOVERNMENT SERVICES, INC. | Department of Veterans Affairs | $299,999,849 | OPTIMIZATION OF THE EHRM SYSTEM | veterans |
| 2026-03-03 | DEPARTMENT OF TRANSPORTATION CALIFORNIA | Department of Transportation | $299,974,280 | PROJECT TITLE: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 :::: PROJECT DESCRIPTION: STATEWIDE STATEWIDE PRELIMINARY ENGINEERING 2024-25 | transportation |
| 2026-05-05 | SAVANNAH RIVER MISSION COMPLETION, LLC | Department of Energy | $299,867,560 | THIS AWARD IS FOR THE SAVANNAH RIVER INTEGRATED MISSION COMPLETION CONTRACT - TASK ORDER 7 (TANK AND ANCILLARY FACILITIES CLOSURE). | energy |
| 2026-06-04 | HENSEL PHELPS CONSTRUCTION CO. | General Services Administration | $299,149,070 | NEW AWARD 47PK0124C0011 - DESIGN BUILD SERVICES - NEW DOUGLAS COMMERCIAL LPOE, DOUGLAS, ARIZONA, AZ 85607 | justice |
| 2026-05-19 | DEPARTMENT OF EDUCATION ARKANSAS | Department of Agriculture | $299,056,509 | CNP CN BLOCK PROG | agriculture |
| 2026-05-11 | SALIENT CRGT, INC. | General Services Administration | $298,793,081 | ENTERPRISE SUPPORT SERVICES AND ENDPOINT TECHNOLOGY (ESSET) TASK ORDER (47QFCA22F0026) AWARD FROM TASK ORDER REQUEST (47QFCA21F0072) IN SUPPORT OF THE US EPA. | environment |
| 2026-04-17 | LA DEPT. OF ADMIN | Department of Agriculture | $297,923,872 | CNP CN BLOCK PROG | social-services |
| 2026-06-05 | GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | Department of Homeland Security | $297,039,419 | OPERATE AND MAINTAIN THE OBIM INFRASTRUCTURE COMPONENTS AND ASSOCIATED APPLICATIONS AND OTHER FUNCTIONALITY OF THE PRODUCTION AND NON-PRODUCTION ENVIRONMENTS AND ASSOCIATED BUSINESS SYSTEMS CURRENTLY DEPLOYED WITH THE DHS DATA CENTER 1, GOVERNMENT AN | intelligence |
| 2026-04-20 | OREGON CHILD DEVELOPMENT COALITION, INC. | Department of Health and Human Services | $296,892,393 | MIGRANT/SEASONAL HEAD START AND EARLY HEAD START | social-services |
| 2026-05-20 | GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | General Services Administration | $296,765,042 | IGF::OT::IGF TASK ORDER AWARD FOR WSP REQUIREMENT | intelligence |
| 2026-05-05 | STATE OF NEW MEXICO | Department of Health and Human Services | $296,551,353 | 2019 EPIDEMIOLOGY AND LABORATORY CAPACITY FOR PREVENTION AND CONTROL OF EMERGING INFECTIOUS DISEASE (ELC) | health |
| 2026-04-20 | PENNSYLVANIA DEPARTMENT OF HEALTH | Department of Health and Human Services | $296,186,537 | CDC-RFA-IP19-1901 IMMUNIZATION AND VACCINES FOR CHILDREN | health |
| 2026-05-08 | ABT GLOBAL LLC | Agency for International Development | $295,954,039 | PREVENTION OF MALARIA THROUGH VECTOR CONTROL | diplomacy |
| 2026-04-20 | PA DEPARTMENT OF HUMAN SERVICES | Department of Health and Human Services | $295,521,149 | PENNSYLVANIA'S MONEY FOLLOWS THE PERSON REBALANCING DEMOSTRATION | social-services |
| 2026-06-05 | PA DEPARTMENT OF HUMAN SERVICES | Department of Health and Human Services | $295,020,968 | E5C6-2021 | social-services |
| 2026-04-06 | ATTORNEY GENERAL OF TEXAS | Department of Health and Human Services | $294,648,083 | CSE-2023 | social-services |
| 2026-04-30 | CARAHSOFT TECHNOLOGY CORP | Department of Agriculture | $294,589,913 | USDA DISC ENTERPRISE WIDE SALESFORCE SOFTWARE&SUPPORT SERVICES | agriculture |
| 2026-05-05 | PERATON ENTERPRISE SOLUTIONS LLC | Department of the Treasury | $294,428,433 | MANAGED INFRASTRUCTURE DATA SERVICE (MIDS) COVID-19 | finance |
| 2026-04-20 | OHIO DEPARTMENT OF HEALTH | Department of Health and Human Services | $294,421,682 | CDC-RFA-IP19-1901 IMMUNIZATION AND VACCINES FOR CHILDREN | health |
| 2026-06-01 | NEW JERSEY TRANSIT CORPORATION | Department of Transportation | $294,272,553 | APPLICATION PURPOSE: THE PURPOSE OF PREVENTIVE MAINTENANCE ACTIVITIES INCLUDE REPAIR MAINTENANCE AND SERVICING OF REVENUE AND NON-REVENUE FLEETS AS WELL AS FACILITIES TO ENSURE RELIABLE PERFORMANCE AND MAXIMIZATION OF ASSET USEFUL LIFE.; ACTIVITIES PERFORMED: PREVENTIVE MAINTENANCE ACTIVITIES AS PER FTA C9030.1E INCLUDE REPAIR MAINTENANCE AND SERVICING OF REVENUE AND NON-REVENUE FLEETS AS WELL AS FACILITIES TO ENSURE RELIABLE PERFORMANCE AND MAXIMIZATION OF ASSET USEFUL LIFE.; EXPECTED OUTCOMES: TO PRESERVE OR EXTEND THE FUNCTIONALITY AND SERVICEABILITY OF NJTS EXISTING ASSETS. SPECIFICALLY PREVENTIVE MAINTENANCE EXPENSES ASSOCIATED WITH INSPECTION CLEANING REPAIRING AND REPLACING COMPONENTS AND SERVICING OF VEHICLES EQUIPMENT YARDS AND FACILITIES. ALL PREVENTATIVE MAINTENANCE ACTIVITIES FUNDED BY THIS GRANT WILL OCCUR WITHIN NJ TRANSITS EXISTING RIGHT OF WAY.; INTENDED BENEFICIARIES: RESIDENTS OF NEW JERSEY AND THE PUBLIC UTILIZE THE NJ TRANSIT PUBLIC TRANSPORTATION SYSTEM THROUGHOUT NEW JERSEY NEW YORK CITY PHILADELPHIA AND SURROUNDING STATES AND METROPOLITAN AREAS.; SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS. | transportation |
| 2026-04-06 | STATE OF RHODE ISLAND DEPARTMENT OF HEALTH | Department of Health and Human Services | $293,973,011 | RHODE ISLAND EPIDEMIOLOGY AND LABORATORY CAPACITY FOR PREVENTION AND CONTROL OF EMERGING INFECTIOUS DISEASES (ELC) | health |
| 2026-05-04 | MISSISSIPPI DEPARTMENT OF EDUCATION | Department of Agriculture | $293,798,670 | CNP CN BLOCK PROG | agriculture |
| 2026-05-19 | FLORIDA DEPARTMENT OF HEALTH | Department of Agriculture | $291,870,307 | WIC FOOD EXPENSE | social-services |
| 2026-03-31 | STATE OF CALIFORNIA ENERGY COMMISSION | Department of Energy | $291,366,906 | DEPARTMENT OF ENERGY, STATE AND COMMUNITY ENERGY PROGRAMS (SCEP): INFLATION REDUCTION ACT OF 2022 (IRA) 50121. SCEP SEEKS TO PROVIDE INITIAL GUIDANCE FOR THE PLANNING, ADMINISTRATION OR TECHNICAL ASSISTANCE FOR FUTURE DISTRIBUTIONS OF FORMULA AWARDS THROUGH THE HOME ENERGY REBATE PROGRAMS, WHICH WILL REQUIRE THE SUBMISSION TO DOE OF HOME ENERGY REBATE PROGRAM PLANS THAT MEET THE REQUIREMENTS SET OUT IN FUTURE HOME ENERGY REBATE PROGRAMS. | energy |
| 2026-03-19 | PERATON ENTERPRISE SOLUTIONS LLC | Department of Labor | $291,197,963 | DOL ENTERPRISE OPERATIONS AND MAINTENANCE SUPPORT SERVICES | labor |
| 2026-05-18 | LMI CONSULTING, LLC | General Services Administration | $291,044,196 | APMTS II AWARD | intelligence |
| 2026-03-03 | STATE OF CALIFORNIA ENERGY COMMISSION | Department of Energy | $290,252,580 | DEPARTMENT OF ENERGY, STATE AND COMMUNITY ENERGY PROGRAMS (SCEP): INFLATION REDUCTION ACT OF 2022 (IRA) 50122. SCEP SEEKS TO PROVIDE INITIAL GUIDANCE FOR THE PLANNING, ADMINISTRATION OR TECHNICAL ASSISTANCE FOR FUTURE DISTRIBUTIONS OF FORMULA AWARDS THROUGH THE HOME ENERGY REBATE PROGRAMS, WHICH WILL REQUIRE THE SUBMISSION TO DOE OF HOME ENERGY REBATE PROGRAM PLANS THAT MEET THE REQUIREMENTS SET OUT IN FUTURE HOME ENERGY REBATE PROGRAMS. | energy |
| 2026-04-01 | PAE GOVERNMENT SERVICES, INC. | Department of State | $287,760,744 | IGF::CT::IGF. OPERATIONS AND MAINTENANCE - PROGRAM MANAGEMENT | diplomacy |
| 2026-05-21 | DEPARTMENT OF VETERANS AFFAIRS OKLAHOMA | Department of Veterans Affairs | $287,467,109 | VHA CBO PURCHASED CARE | veterans |
| 2026-05-27 | DEPARTMENT OF PUBLIC LANDS | Department of Homeland Security | $287,324,548 | GRANT TO LOCAL GOVERNMENT FOR REPAIR OR REPLACEMENT OF DISASTER DAMAGED FACILITIES | environment |
| 2026-05-21 | DEPARTMENT OF SOCIAL SERVICES CONNECTICUT | Department of Health and Human Services | $287,043,938 | MEDICAID ENTITLEMENT FOR 11 - FY 2026 - T19 | social-services |
| 2026-05-05 | DEPARTMENT OF EARLY CARE & LEARNING GEORGIA | Department of Health and Human Services | $287,006,932 | CCDD-2026 - CHILD CARE AND DEVELOPMENT BLOCK GRANT DISCRETIONARY | social-services |
| 2026-05-22 | AEROJET ROCKETDYNE, INC. | National Aeronautics and Space Administration | $286,584,371 | EXPLORATION UPPER STAGE ENGINES MSFC WILL PROCURE TEN (10) RL10 FLIGHT ENGINES FROM AEROJET ROCKETDYNE, INC. TO SUPPORT THE SPACE LAUNCH SYSTEM (SLS) EXPLORATION MISSIONS 2 AND 3 (EM-2 AND EM-3). EACH FLIGHT WILL REQUIRE A FOUR (4) ENGINE CLUSTER. ADDITIONALLY, TWO (2) SPARE ENGINES WILL BE PROCURED. CORRESPONDING TO THESE SPECIFIC RL10 ENGINES, NASA MSFC WILL PROCURE VEHICLE AND PROGRAM INTEGRATION SUPPORT, FLIGHT SUPPORT, AND HUMAN RATING COMPLIANCE REVIEW SUPPORT. | aerospace |
| 2026-03-12 | CACI, INC. - FEDERAL | General Services Administration | $284,267,603 | DISTRIBUTED COMMON GROUND SYSTEM DCGS ENTERPRISE PRODUCT SUPPORT EPS TO 1 | defense |
| 2026-05-19 | DEPARTMENT OF SAFETY & HOMELAND SECURITY | Department of Homeland Security | $283,863,133 | GRANT TO LOCAL GOVERNMENT FOR REPAIR OR REPLACEMENT OF DISASTER DAMAGED FACILITIES | housing |
| 2026-04-20 | STATE OF GEORGIA DEPARTMENT OF PUBLIC HEALTH | Department of Health and Human Services | $283,814,762 | CDC-RFA-IP19-1901 IMMUNIZATION AND VACCINES FOR CHILDREN | health |
| 2026-04-09 | CACI, INC. - FEDERAL | General Services Administration | $283,699,517 | TASK ORDER AWARD OF WBSCM 3. THE PURPOSE OF THIS TO IS TO ACQUIRE INFORMATION TECHNOLOGY (IT) SERVICES TO OPERATE, MAINTAIN, AND PROVIDE CONTINUOUS IMPROVEMENTS FOR THE USDA AND USAID WBSCM SYSTEM AND ITS RELATED SUBSYSTEMS. | agriculture |
| 2026-05-05 | VERIZON BUSINESS NETWORK SERVICES LLC | Social Security Administration | $283,532,560 | ENTERPRISE INFRASTRUCTURE SOLUTIONS (EIS) PROGRAM - SSA DATA NETWORK SERVICES (SSANET) | finance |
| 2026-04-06 | DEPARTMENT OF TRANSPORTATION CONNECTICUT | Department of Transportation | $283,440,000 | APPLICATION PURPOSE: CTDOT IS REQUESTING $283440000 (FEDERAL); $354300000 (TOTAL) OF SECTION 5307 FUNDS FOR THE FOLLOWING PROJECTS:- WATERBURY BRANCH RAILROAD STATIONS (WATERBURY ANSONIA BEACON FALLS SEYMOUR)- NHRY - MASTER COMPLEX CAR DIESEL SHOP- STAMFORD MOE- WALK BRIDGE-UNDERGRADE BRIDGES/ MNR FORCE ACCOUNT (TIME-2)- NHL TRACK PROGRAM; ACTIVITIES PERFORMED: - WATERBURY BRANCH STATIONS- CONSTRUCTION ACTIVITIES AT WATERBURY RAILROAD STATION ANSONIA RAILROAD STATION PLATFORM BEACON FALL RAILROAD STATION PLATFORM SEYMOUR RAILROAD STATION PLATFORM AND WATERBURY PLATFORM WILL ALL BE REPLACED.- NHRY MASTER COMPLEX CAR AND DIESEL SHOP- REHAB/RENOVATION IMPROVEMENTS AT THE - STAMFORD MAINTENANCE OF EQUIPMENT FACILITY- MOE FACILITY: ROOF REPLACEMENT HVAC REPLACEMENT IMPROVEMENTS TO OFFICE AND STAFF SUPPORT AREAS EXTENSION OF TRACK 44 NEW SHOP AIR COMPRESSORS FALL PROTECTION SYSTEMS IT AND SECURITY UPGRADES ELECTRICAL IMPROVEMENTS NEW TRANSFORMER AND AN ADDITION OF A STANDBY GENERATOR.- WALK BRIDGE-THE REPLACEMENT OF THE WALK BRIDGE. THE OBJECTIVE OF THE WALK BRIDGE REPLACEMENT PROJECT IS TO REPLACE THE EXISTING DETERIORATED BRIDGE WITH A RESILIENT BRIDGE STRUCTURE WHICH WILL ENHANCE THE SAFETY AND RELIABILITY OF RAIL SERVICE OFFER OPERATIONAL FLEXIBILITY AND EASE OF MAINTENANCE AND PROVIDE FOR INCREASED CAPACITY AND EFFICIENCIES OF RAIL TRANSPORTATION ALONG THE NHL/NEC WHILE IMPROVING NAVIGATIONAL CAPACITY AND DEPENDABILITY FOR MARINE TRAFFIC IN THE NORWALK RIVER. - EAST AVENUE BRIDGE- BRIDGE NO. 03691R METRO-NORTH RAILROAD MP 42.14 OVER EAST AVENUE- THE PROJECT INCLUDES THE IMPROVEMENTS TO THE ADJACENT EAST NORWALK MNR STATION PLATFORMS AND THE FULL DEMOLITION AND REPLACEMENT OF THE STRUCTURE. - FORT POINT STREET BRIDGE- BRIDGE NO. 04131R METRO-NORTH RAILROAD MP 41.79 OVER FORT POINT STREET- THE EXISTING SUPERSTRUCTURE WILL BE DEMOLISHED AND REPLACED. ADDITIONAL ELEMENTS OF THE PROJECT INCLUDE TRACK AND RAIL SYSTEMS WORK EXTENDING.- PACKAGE F FORCE ACCOUNT (TIME 2)- THIS WORK WILL INCLUDE ALL MNR RAILROAD PROTECTIVE SERVICES AS REQUIRED ENGINEERING/DESIGN PROJECT MANAGEMENT DOCUMENT SUBMITTAL AND REVIEW AS REQUIRED THROUGHOUT THE DURATION OF THE TIME-2 PROJECTS- NHL TRACK PROGRAM- ACTIVITIES INCLUDE THE CONTINUED PURCHASE AND INSTALLATION OF TIES TURNOUTS CONTINUOUS WELDED RAIL AS WELL AS SURFACING TRACK MILES.; EXPECTED OUTCOMES: WATERBURY BRANCH PROJECTS: THE PLATFORMS WILL BE FULLY ADA COMPLIANT AND MEET THE CURRENT MNR/CTDOT OFFICE OF RAIL REQUIREMENTS FOR LIGHTING SECURITY AND PASSENGER AMENITIES. THE PROJECT WILL ALSO INCLUDE PEDESTRIAN SAFETY AND TRAFFIC IMPROVEMENTS. THE RAILROAD STATION PLATFORM REPLACEMENTS WILL ALSO MAINTAIN FIXED GUIDEWAY STATE OF GOOD REPAIR.NHRY MASTER COMPLEX: REHAB/RENOVATION TO IMPROVE THE CONFIGURATION OF THE CAR DIESEL SHOP TO BETTER SUPPORT THE CURRENT AND PROPOSED VEHICLE MAINTENANCE PROGRAMS FOR THE CTRAIL FLEET.WALK/ STAMFORD MOE/UNDERGRADE BRIDGES/FORCE ACCOUNT- ENHANCE THE SAFETY AND RELIABILITY OF RAIL SERVICE OFFER OPERATIONAL FLEXIBILITY AND EASE OF MAINTENANCE AND PROVIDE FOR INCREASED CAPACITY AND EFFICIENCIES OF RAIL TRANSPORTATION ALONG THE NHL/NEC WHILE IMPROVING NAVIGATIONAL CAPACITY AND DEPENDABILITY FOR MARINE TRAFFIC IN THE NORWALK RIVER.TRACK PROGRAM: ALL WORK IS BASED ON THE ANNUAL CYCLE IN ORDER TO MAINTAIN OPERATING SPEEDS AND COMFORT.; INTENDED BENEFICIARIES: BENEFICIARIES OF THIS PROJECT INCLUDE THE NORTHEAST CORRIDOR METRO-NORTH RAILROAD AMTRAK THE NEW HAVEN LINE PASSENGERS AS WELL AS TRANSIT COMMUTERS STATEWIDE.RESIDENTS AND RAIL PASSENGERS ACROSS THE STATE OF CONNECTICUT.; SUBRECIPIENT ACTIVITIES: BRIDGES REPLACEMENT - DEMOLITION AND REPLACEMENT/CONSTRUCTIONWORK FORCES - MNR RAILROAD PROTECTIVE SERVICES AS REQUIRED ENGINEERING/DESIGN PROJECT MANAGEMENT DOCUMENT SUBMITTAL AND REVIEW | transportation |
| 2026-06-03 | CITY OF LONG BEACH | Department of Transportation | $283,375,812 | AWARD PURPOSE THE PROJECT WILL COMPLETE THE PIER B ONDOCK RAIL SUPPORT FACILITY PROGRAM BY COMPLETING THE NORTH RAIL YARD EXPANSION AND THE SOUTH RAIL YARD EXPANSION. THE NORTH RAIL YARD EXPANSION WILL CONSTRUCT TWO NEW MAINLINE TRACKS FIVE NEW APPROXIMATELY 10000 FOOT RECEIVING AND DEPARTURE TRACKS EXTENDING FROM WEST OF THE DOMINGUEZ CHANNEL TO THE PICO AVENUE RAIL CORRIDOR AND 28 NEW STORAGE TRACKS NORTH OF THE EXISTING PIER B YARD. IT ALSO INCLUDES ACTIVE AT GRADE WARNING DEVICES AND RAILROAD PREEMPTION WITH A NEW TRAFFIC SIGNAL AT PIER B STREET. THE SOUTH RAIL YARD EXPANSION WILL ADD SEVEN NEW APPROXIMATELY 3000 FOOT STORAGE TRACKS LENGTHEN AND REHABILITATE SEVEN EXISTING APPROXIMATELY 3000 FOOT STORAGE TRACKS CONSTRUCT TWO NEW TRACKS IN THE PICO AVENUE RAIL CORRIDOR RECONFIGURE TRACKS NEAR PIER D STREET AND CONSTRUCT A NEW COMPRESSED AIR FACILITY. ACTIVITIES TO BE PERFORMED ELEMENT 1 CONSTRUCTION PHASE ARCHITECTURAL AND ENGINEERING A AND E. ENGINEERING DURING CONSTRUCTION MANAGEMENT PROJECT MANAGEMENT AND CONSTRUCTION SUPPORT DURING BID AND AWARD CONSTRUCTION AND CLOSEOUT. ELEMENT CONSTRUCTION CONSTRUCT TWO NEW MAINLINE TRACKS FIVE NEW APPROXIMATELY 10000 FOOT RECEIVING AND DEPARTURE TRACKS EXTENDING FROM WEST OF THE DOMINGUEZ CHANNEL TO THE PICO AVENUE RAIL CORRIDOR 28 NEW STORAGE TRACKS NORTH OF THE EXISTING PIER B YARD CONSTRUCT THE ROADWAY KNUCKLE AT HARBOR AVENUE AND 11TH STREET RECONSTRUCTED EXISTING PIER B RAIL YARD BY ADDING SEVEN NEW APPROXIMATELY 3000 FOOT STORAGE TRACKS AND LENGTHEN AND REHABILITATE SEVEN EXISTING APPROXIMATELY 3000 FOOT STORAGE TRACKS CONSTRUCT TWO NEW TRACKS IN THE PICO AVENUE RAIL CORRIDOR RECONFIGURE MEAD YARD LADDER AND LEAD TRACK ACROSS ANAHEIM WAY AND ADD ACTIVE AT GRADE WARNING DEVICES AND RAILROAD PRE EMPTION WITH A NEW TRAFFIC SIGNAL AT PIER B STREET RECONFIGURE TRACKS NEAR PIER D STREET AND CONSTRUCT A NEW COMPRESSED AIR FACILITY WITH ASSOCIATED PIPING WITHIN THE RAIL YARD. APPROXIMATE TOTAL PROJECT QUANTITIES INCLUDE 175000 FEET OF NEW TRACK 150 NEW ITEMS OF SPECIAL TRACK WORK AND 150REMOTELY CONTROLLED POWER SWITCH OPERATORS. DELIVERABLES EXPECTED OUTCOMES FROM PAGE 10 SCHEDULE G OF THE GRANT AGREEMENT INTENDED BENEFICIARY CITY OF LONG BEACH. SUBRECIPIENT ACTIVITIES NONE. MEASURE FREIGHT MOVEMENTS. PROJECTED OUTCOME AN INCREASE IN THE TOTAL NUMBER OF CONTAINERS MOVED BY ON DOCK RAIL. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS A TABLE THAT SHOWS THE TOTAL NUMBER OF CONTAINERS AND THE TOTAL NUMBER OF CONTAINERS MOVED BY ON DOCK RAIL IN THE STUDY AREA. MEASUREMENT FREQUENCY ANNUAL. MEASURE GROSS TONS. PROJECTED OUTCOME AN INCREASE IN CARGO TONNAGE MOVED THROUGH MARINE TERMINALS. CATEGORY AND DESCRIPTION ECONOMIC COMPETITIVENESS THE TOTAL NUMBER OF GROSS SHORT TONS THAT MOVED THROUGH THE STUDY ARE. MEASUREMENT FREQUENCY ANNUAL. | transportation |
Page 17 of 94