The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$33,964,645

Department of Transportation·Federal Highway Administration

to M.A. DEATLEY CONSTRUCTION, INC.

transportationexpiredONGOING · MOD OF 2022 CONTRACT
WORK BEGAN2022-04-11·LATEST ACTION2026-04-29·SOURCEUSASPENDING·SOURCE IDCONT_AWD_69056722F000073_6925_69056719D000005_6925
Award description

WY NPS YELL 14(1), LEWIS RIVER BRIDGE

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Modification to ongoing Lewis River Bridge construction in Wyoming, begun in 2022.

Sub-sectors
bridge-constructionfhwa-contracthighway-infrastructure
Why this matters

Bridge infrastructure supports regional transportation and Yellowstone National Park access.

Supply-chain signal

Drives demand for concrete, steel, and heavy construction equipment suppliers.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-16. Cost: $0.012198.

Period of performance
Start
2022-04-11
End
2025-11-07
Status
expired248 days ago
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$34.0M Department of Transportation — The Buildout — The Buildout