$33,964,645
Department of Transportation·Federal Highway Administration
to M.A. DEATLEY CONSTRUCTION, INC.
WORK BEGAN2022-04-11·LATEST ACTION2026-04-29·SOURCEUSASPENDING·SOURCE IDCONT_AWD_69056722F000073_6925_69056719D000005_6925
Award description
WY NPS YELL 14(1), LEWIS RIVER BRIDGE
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
The Buildout's read
What the model surfaced from this award
Confidence: high
In plain English
Modification to ongoing Lewis River Bridge construction in Wyoming, begun in 2022.
Sub-sectors
bridge-constructionfhwa-contracthighway-infrastructure
Why this matters
Bridge infrastructure supports regional transportation and Yellowstone National Park access.
Supply-chain signal
Drives demand for concrete, steel, and heavy construction equipment suppliers.
Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-16. Cost: $0.012198.
Period of performance
Start
2022-04-11
End
2025-11-07
Status
expired248 days ago
Sources
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_69056722F000073_6925_69056719D000005_6925.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.