The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$44,127,088

General Services Administration·Public Buildings Service

to DAWN/HIGLEY JV II, LLC

otheractive
WORK BEGAN2026-04-30·LATEST ACTION2026-04-28·SOURCEUSASPENDING·SOURCE IDCONT_AWD_47PB5226C0009_4740_-NONE-_-NONE-
Award description

DESIGN-BUILD SERVICES FOR PLAZA REPLACEMENT AT THE CARL B. STOKES U.S. COURTHOUSE, CLEVELAND, OH

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Design-build services for plaza replacement at the Carl B. Stokes U.S. Courthouse in Cleveland, Ohio.

Sub-sectors
federal-real-estatecourthouse-infrastructuredesign-build-contract
Why this matters

Maintains critical federal judicial infrastructure and courthouse accessibility in a major metropolitan area.

Supply-chain signal

Signals demand for construction materials, architectural services, and general contracting capacity in the Cleveland region.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002005.

Period of performance
Start
2026-04-30
End
2029-11-20
Status
activein 1281 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.