The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$45,009,758

Department of the Interior·Bureau of Reclamation

to NW CONSTRUCTION, INC

energyexpired
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_140R6023C0002_1425_-NONE-_-NONE-
Award description

THE PURPOSE OF THIS CONTRACT IS TO PERFORM MODIFICATIONS TO FRESNO DAM LOCATED IN HILL COUNTY, MONTANA

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Modifications and upgrades to Fresno Dam in Montana to improve structural integrity and operational capacity.

Sub-sectors
water-infrastructuredam-operationshydroelectric
Why this matters

Dam maintenance is critical infrastructure ensuring water supply, flood control, and hydroelectric generation for regional energy security.

Supply-chain signal

Signals demand for heavy construction equipment, engineering services, and specialized dam repair materials from regional suppliers.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-14. Cost: $0.001164.

Period of performance
Start
2023-03-07
End
2026-03-12
Status
expired63 days ago
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.