$46,495,567
DESIGN BUILD CONSTRUCTION OF BAGHDAD POWER PLAN REMEDIATION
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Design and build construction of power plant remediation infrastructure in Baghdad, Iraq.
Critical infrastructure reconstruction supporting U.S. diplomatic and stabilization objectives in Iraq.
Large construction contract signals demand for engineering, materials, and labor for Middle Eastern infrastructure projects.
U.S. infrastructure investment in Iraq counters Chinese Belt and Road influence in the region.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.001981.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier CONT_AWD_19AQMM25C0813_1900_-NONE-_-NONE-.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.