The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$61,287,119

Department of Transportation·Federal Highway Administration

to TRANSPORTATION & DEVELOPMENT LOUISIANA D

WORK BEGAN·LATEST ACTION2026-03-18·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22330000Y233LAH015028_069
Award description

PROJECT TITLE: LA 302: BAYOU BARATARIA MB REPL PHASE 1 :::: PROJECT DESCRIPTION: SCOPE: CONSTRUCTION OF THE MAIN SPAN AND OPERATOR HOUSE FOR REPLACEMENT OF THE LEO KERNER MOVABLE BRIDGE. PHASE 1 OF H.002264

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds Phase 1 construction of the replacement Leo Kerner Movable Bridge main span and operator house in Louisiana's Bayou Barataria.

Sub-sectors
highway-bridge-replacementphase-1-multipartfhwa-formula-grant
Why this matters

Bridge infrastructure supports regional commerce and coastal resilience in Louisiana's Bayou Barataria basin.

Supply-chain signal

Supports demand for bridge construction materials, steel, and specialized engineering expertise from Louisiana contractors.

Generated by award_classification v2.1.0 via claude-haiku-4-5-20251001 on 2026-06-06. Cost: $0.010979.

Period of performance
Start
End
2027-12-31
Status
activein 536 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$61.3M Department of Transportation — The Buildout — The Buildout