The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta

$80,695,125

Department of Transportation·Federal Highway Administration

to LPC CONTRACTORS INC

transportationactiveONGOING · MOD OF 2022 CONTRACT
WORK BEGAN2022-03-10·LATEST ACTION2026-05-06·SOURCEUSASPENDING·SOURCE IDCONT_AWD_693C7322C000008_6925_-NONE-_-NONE-
Award description

PROJECT PR ER PRMNT RPR (10) THE PROJECT CONSISTS OF REPAIRING DAMAGE CAUSED BY HURRICANES IRMA AND MARIA ON PR-10 BETWEEN KMS 41.6 AND 47.5. THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, REINFORCED SOIL SLOPE SYSTEMS CONSTRUCTION, DRAINAGE SYSTEM

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Repair hurricane damage to Puerto Rico Highway PR-10 through embankment reconstruction, soil slope systems, and drainage improvements.

Sub-sectors
highway-infrastructuredisaster-recoveryfhwa-contract
Why this matters

Critical infrastructure restoration in Puerto Rico following major hurricanes; maintains regional connectivity and economic activity.

Supply-chain signal

Signals demand for heavy construction materials, earthwork equipment, and drainage system suppliers in Puerto Rico recovery efforts.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002070.

Period of performance
Start
2022-03-10
End
2028-05-31
Status
activein 744 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.