$83,160,497
to GILA RIVER INDIAN COMMUNITY
PURPOSE: ACTIVITIES TO BE PERFORMED: THE ACTIVITIES TO BE PERFORMED ARE AS FOLLOWS:-COMPLIANCE NEPA-PIPE ORDER ACQUISITION-PIPE DELIVERY FOR SPUR AND HIGHLINE SITES-HIGHLINE SITE PIPE INSTALLATION-SPUR DROP SITE PIPE INSTALLATION-PIPE DELIVERY FOR MEMORIAL SITE-SPUR DROP PUMP STATION-JACK AND BORES COMPLETION-MEMORIAL SITE PIPE INSTALLATION-MEMORIAL PUMP STATION-COMPLETION OF PHASE 1-COMPLETION OF PHASE 2-FINAL PROJECT REPORTEXPECTED DELIVERABLES OR OUTCOMES: THE OUTCOME IF THIS PROJECT WILL BE THE LAYING OF OVER 19 MILES OF NEW RECLAIMED WATER PIPE AND CREATION OF NEW PUMPING STATIONS. INTENDED BENEFICIARIES: THE UNITED STATES PUBLIC AND THE RECIPIENT ARE THE INTENDED BENEFICIARIES. SUBRECIPIENT ACTIVITIES: THE RECIPIENT WILL CONTRACT FOR THE SITE CLEARING, INSTALLATION OF PIPE, INSTALLATION OF PUMPING STATIONS, EXCAVATIONS, DESIGN COSTS, AND PIPE ACQUISITION.
Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.
What the model surfaced from this award
Install 19 miles of reclaimed water pipe and pumping stations for the Gila River Indian Community water infrastructure project.
Supports tribal water rights implementation and sustainable water management in the arid Southwest, critical for long-term water security.
Large pipe acquisition and installation contracts will flow to construction and water infrastructure suppliers; pumping station manufacturing demand.
Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002349.
- USAspending.gov — all awards for this UEI →
- SAM.gov entity registration →
- Award record ingested from usaspending. Source identifier ASST_NON_R23AP00215_014.
The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.