The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$109,836,576

Department of Transportation·Federal Highway Administration

to EXECUTIVE OFFICE OF THE COMMONWEALTH OF KENTUCKY

ACTION DATE2026-04-17·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22230000Y001KY2641176_069
Award description

PROJECT TITLE: JEFFERSON- RECONSTRUCT I-264 (WATTERNSON EXPRESSWAY)/US42 INTERCHANGE AS A APUI- DE FOR INTERCHANGE RECONSTRUCTION. :::: PROJECT DESCRIPTION: RECONSTRUCT/WIDEN I-264 (WATTERSON EXPRESSWAY) FROM WESTPORT ROAD (KY-1447) TO I-71, INCLUDING THE US-42 INTERCHANGE AS A SPUI.(PROJECT INCLUDES 5-594)

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Reconstruct and widen I-264 (Watterson Expressway) from Westport Road to I-71, including US-42 interchange reconfiguration.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterstate-reconstruction
Why this matters

Major Louisville interstate corridor improvement enhances regional mobility, freight movement, and economic connectivity in Kentucky.

Supply-chain signal

Drives demand for construction materials, heavy equipment, engineering services, and asphalt/concrete suppliers in the Louisville metropolitan area.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002197.

Period of performance
Start
End
2029-12-31
Status
activein 1324 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.