The BuildoutBeta

$1,550,689,354

National Aeronautics and Space Administration·National Aeronautics and Space Administration

to BECHTEL NATIONAL, INC.

aerospaceexpiring · 22d· period of performance ends in 22 days
ACTION DATE·SOURCEUSASPENDING·SOURCE IDCONT_AWD_80KSC019C0013_8000_-NONE-_-NONE-
Award description

DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Design and construction of Mobile Launcher 2 for NASA's Space Launch System rocket.

Sub-sectors
space-launchheavy-lift-vehicles
Why this matters

SLS is critical U.S. infrastructure for deep-space exploration and lunar/Mars missions, ensuring American independent human spaceflight capability.

Supply-chain signal

Large contract to major aerospace contractor signals sustained demand for specialized launch infrastructure components and integration services.

U.S.–China competition angle

SLS development directly counters China's advancing space capabilities and supports U.S. leadership in human spaceflight and lunar exploration.

Generated by award_classification v1.0.0 via claude-haiku-4-5-20251001 on 2026-05-13. Cost: $0.001316.

Period of performance
Start
2019-07-01
End
2026-06-05
Status
expiring · 22din 22 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.

$1.6B National Aeronautics and Space Administration — The Buildout — The Buildout