The weekly federal-spending brief. One email a Sunday. Free. No tracking.
The BuildoutBeta
Awards/FORMULA GRANT (A)

$134,102,775

Department of Transportation·Federal Highway Administration

to GEORGIA DEPARTMENT OF TRANSPORTATION

ACTION DATE2026-03-18·SOURCEUSASPENDING·SOURCE IDASST_NON_693JJ22430000Y001GA0018193_069
Award description

PROJECT TITLE: I-285 FROM CS 843/COLLIER DRIVE TO CR 2838/PACES FERRY ROAD, PE :::: PROJECT DESCRIPTION: I-285 FROM CS 843/COLLIER DRIVE TO CR 2838/PACES FERRY ROAD, PE

Verbatim from USAspending.gov. Capitalization, abbreviations, and codes are unchanged.

The Buildout's read

What the model surfaced from this award

Confidence: high
In plain English

Funds preliminary engineering for I-285 highway segment improvements between Collier Drive and Paces Ferry Road in Georgia.

Sub-sectors
highway-infrastructurefhwa-formula-grantinterstate-maintenance
Why this matters

I-285 is a critical circumferential interstate around Atlanta; infrastructure investment supports regional economic mobility and freight movement.

Supply-chain signal

Preliminary engineering phase will drive demand for design consultants, engineering firms, and construction planning services in the Southeast.

Generated by award_classification v2.0.0 via claude-haiku-4-5-20251001 on 2026-05-15. Cost: $0.002104.

Period of performance
Start
End
2032-04-30
Status
activein 2175 days
Sources

The Buildout does not edit federal records. Any inaccuracy reflects the upstream source; it will update here when corrected there.